Skip to main content
  • 4501 Accesses

Abstract

This chapter focuses on the definition of a project, including the designation of who is responsible for what progress by when. By definition, those applying six sigma methods must answer some or all of these questions in the first phase of their system improvement or new system design projects. Also, according to what may be regarded as a defining principle of six sigma, projects must be costjustified or they should not be completed. Often in practice, the needed cost justification must be established by the end of the “define” phase.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 99.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Clausing D (1994) Total Quality Development: A Step-By-Step Guide to World-Class Concurrent Engineering. ASME Press, New York

    Google Scholar 

  • Goldratt EM, Cox J (2004) The Goal, 3rd edition. North River Press, Great Barrington, MA

    Google Scholar 

  • Lee W, Mulliss C, Chiu HC (2000) On the Standard Rounding Rule for Addition and Subtraction. Chinese Journal of Physics 38:36–41

    Google Scholar 

  • Martin P, Oddo F, Tate K (1997) The Project Management Memory Jogger: A Pocket Guide for Project Teams. Goal/Qpc, Salem, NH

    Google Scholar 

  • Mullis C, Lee W (1998) On the Standard Rounding Rule for Multiplication and Division. Chinese Journal of Physics 36:479–487

    Google Scholar 

  • Robert SC, Robert HM III, Robert GMH (2000) Robert’s Rules of Order, 10th edn. Robert HM III, Evans WJ, Honemann DH, Balch TJ (eds). Perseus Publishing, Cambridge, MA

    Google Scholar 

  • Streibel BJ (2002) The Manager’s Guide to Effective Meetings. McGraw-Hill, New York

    Google Scholar 

Download references

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag London Limited

About this chapter

Cite this chapter

(2010). Define Phase and Strategy. In: Introduction to Engineering Statistics and Lean Sigma. Springer, London. https://doi.org/10.1007/978-1-84996-000-7_3

Download citation

  • DOI: https://doi.org/10.1007/978-1-84996-000-7_3

  • Publisher Name: Springer, London

  • Print ISBN: 978-1-84882-999-2

  • Online ISBN: 978-1-84996-000-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics