Skip to main content

The Ongoing Challenge: Creating an Enterprise-Wide Detailed Supply Chain Plan for Semiconductor and Package Operations

  • Chapter
  • First Online:

Part of the book series: International Series in Operations Research & Management Science ((ISOR,volume 152))

Abstract

In the mid-1980s, Karl Kempf of Intel and Gary Sullivan of IBM independently proposed that planning, scheduling, and dispatch decisions across an enterprise’s demand-supply network were best viewed as a series of information flows and decision points organized in a hierarchy or set of decision tiers (Sullivan 1990). This remains the most powerful method to view supply chains in enterprises with complex activities. Recently, Kempf (2004) eloquently rephrased this approach in today’s supply chain terminology, and Sullivan (2005) added a second dimension based on supply chain activities to create a grid (Fig. 14.1) to classify decision support in demand-supply networks. The row dimension is decision tier and the column dimension is responsible unit. The area called global or enterprise-wide central planning falls within this grid.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   89.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   119.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Arntzen B, Brown G, Harrison T, Trafton L (1995) Global supply chain management at digital equipment corporation. Interfaces 25(1):69–93

    Article  Google Scholar 

  2. Bermon S, Hood S (1999) Capacity optimization planning system (CAPS). Interfaces 29(5):31–50

    Article  Google Scholar 

  3. Burda R, Degbotse A, Dews B, Milne RJ, Sullivan G (2007) Who would have thought – optimization in fabricator dispatch and artificial intelligence in enterprise wide planning. In: (Working paper) IBM Strategic Systems, 1000 River Road, Essex Junction, VT 05452, USA

    Google Scholar 

  4. Dangat GS, Gokhale AR, Li S, Milne RJ, Orzell RA, Reid RL, Tang X, Yen C (1999) Best can do matching of assets with demand in microelectronics manufacturing. U.S. Patent 5,971,585, 26 Oct 1999

    Google Scholar 

  5. Davenport T (2006) Competing on analytics. Harvard Business Review, January 2006, pp 1–9

    Google Scholar 

  6. Denton B, Milne RJ (2006) Method for optimizing material substitutions within a supply chain. U.S. Patent 6,983,190, 3 Jan 2006

    Google Scholar 

  7. Denton B, Hedge S, Orzell RA (2004) Method of calculating low level codes for considering capacities. U.S. Patent 6,584,370, 18 May 2004

    Google Scholar 

  8. Denton B, Forrest J, Milne RJ (2005) A method for considering hierarchical preemptive demand priorities in a supply chain optimization model. U.S. Patent Application: 2005–0171828, also, IBM docket: BUR9–2003–0198US1

    Google Scholar 

  9. Denton B, Forrest J, Milne RJ (2006) Methods for solving a mixed integer program for semiconductor supply chain optimization at IBM. Interfaces 36(5):386–399

    Article  Google Scholar 

  10. Duchessi P (1987) The conceptual design for a knowledge based system as applied to the production planning process. In: Silverman B (ed) Expert systems for business, pp 163–194

    Google Scholar 

  11. Fogarty D, Hoffman T (1983) Production and inventory management. South-West Publishing, Cincinnati, OH

    Google Scholar 

  12. Fordyce K (1998) Matching assets with demand engines for PROFIT and supply chain management. MicroNews (a publication of the IBM Microelectronics Division, 3rd Quarter, 1998) 4(3). www.chips.ibm.com/micronews/vol4_no3/profit.html

  13. Fordyce K (2001) New supply chain management applications provide better customer service: serious gets exciting. MicroNews (a publication of the IBM Microelectronics Division, 2nd Quarter, 2001) 6(3). http://www.chips.ibm.com/micronews/vol7_no2/fordyce.html

  14. Forrester J (1961) Industrial dynamics. M.I.T. Press, Cambridge, MA

    Google Scholar 

  15. Galbraith J (1973) Designing complex organizations. Addison-Wesley, Reading, MA

    Google Scholar 

  16. Glover F, Jones G, Karney D, Klingman D, Mote J (1979) An integrated production, distribution, and inventory planning system. Interfaces 9(5):21–35

    Article  Google Scholar 

  17. Goldman S (2004) Science in the twentieth century. Great Courses on CD by the Teaching Company, Chantilly, VA

    Google Scholar 

  18. Graves RJ, Konopka JM, Milne RJ (1995) Literature review of material flow control mechanisms. Prod Plan Contr 6(5):395–403

    Article  Google Scholar 

  19. Hackman ST, Leachman RC (1989) A general framework for modeling production. Manag Sci 35(4):478–495

    Article  Google Scholar 

  20. Hegde SR, Milne RJ, Orzell RA, Pati MC, Patil SP (2004) Decomposition system and method for solving a large-scale semiconductor production planning problem. United States Patent No. 6,701,201 B2

    Google Scholar 

  21. IBM white paper G510–6402–00 (2005) DIOS – dynamic inventory optimization, IBM Corporation, 1133 Westchester Avenue, White Plains, NY 10604, USA

    Google Scholar 

  22. IBM white paper G299–0906–00 (2006) Collaboration with IBM E&TS Helps ADI Stay ahead of Customer Demand, IBM Corporation, 1133 Westchester Avenue, White Plains, NY 10604, USA

    Google Scholar 

  23. Kempf K (1994) Intelligently scheduling wafer fabrication. In: Intelligent scheduling. Morgan Kaufmann, San Francisco, CA, pp 517–544 (Chapter 18)

    Google Scholar 

  24. Kempf K (2004) Control-oriented approaches to supply chain management in semiconductor manufacturing. In: Proceedings of the 2004 American control conference, Boston, MA, pp 4563–4576

    Google Scholar 

  25. Leachman R, Benson R, Liu C, Raar D (1996) IMPReSS: an automated production planning and delivery-quotation system at Harris corporation – semiconductor sector. Interfaces 26(1):6–37

    Article  Google Scholar 

  26. Lee HL, Padmanabhan V, Whang S (1997) Information distortion in a supply chain: the bullwhip effect. Manag Sci 43(4) (special issue on frontier research in manufacturing and logistics):546–558

    Google Scholar 

  27. Lin G, Ettl M, Buckley S, Yao D, Naccarato B, Allan R, Kim K, Koenig L (2000) Extended enterprise supply chain management at IBM personal systems group and other divisions. Interfaces 30(1):7–25

    Article  Google Scholar 

  28. Little J (1992) Tautologies, models and theories: can we find “laws” of manufacturing? IIE Trans 24(3):7–13

    Article  Google Scholar 

  29. Lyon P, Milne RJ, Orzell R, Rice R (2001) Matching assets with demand in supply-chain management at IBM microelectronics. Interfaces 31(1):108–124

    Article  Google Scholar 

  30. Milne RJ, Orzell RA, Yen C (1999) Advanced material requirements planning in microelectronics manufacturing. U.S. Patent 5,943,484, 28 Aug 1999

    Google Scholar 

  31. Norden P (1993) Quantitative techniques in strategic alignment. IBM Syst J 32(1):180–197

    Article  Google Scholar 

  32. Orlicky J (1975) Material requirements planning: the new way of life in production and inventory management. McGraw-Hill, New York

    Google Scholar 

  33. Orzell R, Patil S, Wang C (2004) Method for identifying product assets in a supply chain used to satisfy multiple customer demands. U.S. Patent 20050177465A1, 17 Oct 2004

    Google Scholar 

  34. Promoting O.R.: The Science of Better (2005) Matching assets to supply chain demand at IBM microelectronics. http://www.orchampions.org/prove/success_stories/mascdi.htm

  35. Simon HA (1957) Administrative behavior, 2nd edn. The Free Press, New York

    Google Scholar 

  36. Shobrys D (2003) “History of APS,” Supply Chain Consultants (www.supplychain.com), 460 Fairmont Drive, Wilmington, DE 19808, USA

  37. Shobrys D, Fraser J (2003) Planning for the next generation (supply chain planning). Manuf Eng 82(6):10–13

    Article  Google Scholar 

  38. Singh H (2007) Personal communication with Ken Fordyce supply chain consultants (www.supplychain.com), 460 Fairmont Drive, Wilmington, DE 19808, USA

  39. Sullivan G (1990) IBM Burlington’s logistics management system (LMS). Interfaces 20(1):43–61

    Article  Google Scholar 

  40. Sullivan G (2005) PROFIT: decision technology for supply chain management at IBM microelectronics division. In: Applications of supply chain management and E-commerce research. Springer, New York, pp 411–452

    Google Scholar 

  41. Sullivan G (2007) Evaluating planning engines in 1994, working paper, chapter in memoirs

    Google Scholar 

  42. Sullivan G, Jantzen J, Morreale M (1991) Using Boolean matrices or integer vectors to analyze networks. In: APL91 Proceedings editor Jan Engel, APL Quote Quad, vol 21(4), pp 174–185

    Google Scholar 

  43. Swaminathan J, Smith S (1998) Modeling supply chain dynamics: a multi agent approach. Decis Sci 29(3):607–632

    Article  Google Scholar 

  44. Tayur S, Ganeshan R, Magazine M (1998) Quantitative models for supply chain management. Kluwer Academic, Boston, MA

    Google Scholar 

  45. Uzsoy R, Lee C, Martin-Vega LA (1992) A review of production planning and scheduling modules in the semiconductor industry, Part 1: System characteristics, performance evaluation, and production planning. IIE Trans, Scheduling Logistics 24(4):47–60

    Google Scholar 

  46. Uzsoy R, Lee C, Martin-Vega LA (1994) A review of production planning and scheduling modules in the semiconductor industry, Part 2: Shop floor control. IIE Trans, Scheduling Logistics 26(5):44–55

    Google Scholar 

  47. Wolfson R (2000) Einstein’s relativity and the quantum revolution. Great Courses on CD by the Teaching Company, Chantilly, VA

    Google Scholar 

  48. Woolsey G (1979) Ten ways to go down with your MRP. Interfaces 9(5):77–80

    Article  Google Scholar 

  49. Zisgen H (2005) EPOS – stochastic capacity planning for wafer fabrication with continuous fluid models. IBM Global Engineering Services, Decision Technology Group Mainz, Germany

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Kenneth Fordyce .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer New York

About this chapter

Cite this chapter

Fordyce, K. et al. (2011). The Ongoing Challenge: Creating an Enterprise-Wide Detailed Supply Chain Plan for Semiconductor and Package Operations. In: Kempf, K., Keskinocak, P., Uzsoy, R. (eds) Planning Production and Inventories in the Extended Enterprise. International Series in Operations Research & Management Science, vol 152. Springer, New York, NY. https://doi.org/10.1007/978-1-4419-8191-2_14

Download citation

Publish with us

Policies and ethics