Skip to main content

Transboundary IWRM Attempts in the Mediterranean Emphasis on the Drin River Case and the Involvement of Stakeholders

  • Chapter
  • First Online:
Integrated Water Resources Management in the Mediterranean Region
  • 1278 Accesses

Abstract

Integrated Water Resources Management (IWRM) is a holistic, participatory approach with involvement of all relevant stakeholders to address effectively water issues at river basin level within either a national or transnational framework. In the EU countries, the EU WFD provides for cooperation of riparians with stakeholders toward this end. In the wider Mediterranean region, very few relevant attempts have been made, with limited results. This chapter briefly refers to three cases with different “models” and level of involvement of stakeholders: The NW Sahara Aquifer System with rather limited stakeholder involvement, mostly, from the research and academic community; the Sava River case with a stakeholder involvement added, rather late, in the process; and the Drin River case, where the stakeholder involvement was – to a certain extent – one of the driving forces, integrated from the beginning into the process. The latter case is analyzed in detail, explaining the main specificities of the Drin Basin system, the international framework within which the Drin Dialogue was developed, the key players, the NGO and other stakeholders’ role and contribution, and the important results until now, including the adoption of a Memorandum of Understanding among the riparians.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    The lake is called Skadar in Montenegro and Shkoder in Albania.

  2. 2.

    The river is called Drini i Zi in Albania and Crn Drim in the former Yugoslav Republic of Macedonia.

  3. 3.

    The river is called Drini i Bardhë in Albania and Beli Drin in Kosovo.

  4. 4.

    The river is called Buna in Albania and Bojana in Montenegro.

References

  • Benoit G, Comeau A (eds) (2005) A sustainable future for the Mediterranean: the blue plan’s environment and development outlook. Earthscan, London/Sterling

    Google Scholar 

  • Black E (2009) The impact of climate change on daily precipitation statistics in Jordan and Israel. Atmos Sci Lett 10(3):192–200

    Article  Google Scholar 

  • Comair FG (2009) Water management and hydrodiplomacy in Lebanon. Notre Dame University Press, Louaize. ISBN 5-03-458-9953-978

    Google Scholar 

  • Conley AH, van Niekirk PH (2000) Sustainable management of international waters: the Orange River case. Water Policy 2:139–149

    Article  Google Scholar 

  • European Commission (2000) Directive 2000/60/EC of the European Parliament and of the Council of 23 October 2000 establishing a framework for Community action in the field of water policy. Official Journal L 327 of 22.12.2000. Available at: http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2000:327:0001:0072:EN:PDF

  • Feitelson M (2002) Implications of the shifts in the Israeli water discourse for Israeli-Palestinian water negotiations. Polit Geogr 21(3):293–318

    Article  Google Scholar 

  • Gleick P (1994) Water wars and peace in the Middle East. Policy Anal 36(4):22

    Google Scholar 

  • GWP (2000) Integrated water resources management. TAC background papers, no 4, Stockholm

    Google Scholar 

  • Scoullos M, Tomassini B (2003) Handbook on freshwater in the Mediterranean. GWP-Med and MIO-ECSDE, Athens. ISBN 960-87842-5-5

    Google Scholar 

  • Scoullos M, Malotidi V, Spirou S, Constantianos V (2002) Integrated water resources management in the Mediterranean. GWP-Med and MIO-ECSDE, Athens, p 36. ISBN 960-86312-8-9

    Google Scholar 

  • Wolf AT (1998) Conflict and cooperation along international waterways. Water Policy 1(2):251–265

    Article  Google Scholar 

  • Zeitoun M, Warner J (2006) Hydro-hegemony – a framework for analysis of trans-boundary water conflicts. Water Policy 8(5):435–460

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Michael Scoullos .

Editor information

Editors and Affiliations

Annex

Annex

1.1 The Drin: A Strategic Shared Vision

1.1.1 Memorandum of Understanding for the Management of the Extended Transboundary Drin Basin

1.1.1.1 Preamble
  1. 1.

    Mindful of the Ohrid Declaration of 18 April 2011 in which we, the water and/or environment competent Ministers of the Drin Riparians (hereinafter, the “Ministers”), committed to negotiate and adopt a Shared Vision document on the coordinated management of the Extended Transboundary Drin Basin (hereinafter the “Drin Basin”)

  2. 2.

    Expressing our political will towards basin-wide mutual understanding in water management as a precondition for cooperation towards sustainable development

  3. 3.

    With full appreciation of the work of the Drin Core Group whose establishment in 2009 signalled the initiation of the Dialogue among the stakeholders for the management of the Drin Basin (Drin Dialogue) and taking fully into consideration the outcomes of the Drin Dialogue

  4. 4.

    Confirming our commitment to sustainable development in the Drin Basin that can be brought about in a coherent way through transboundary cooperation, in accordance with the principles of the European Union integration process

  5. 5.

    Aware that the Drin River is the connecting agent of an extended shared watershed, including a number of shared water bodies and an adjacent sea, the Adriatic, linking these into a hydrologic system that supports a variety of ecosystems within the Drin Basin

  6. 6.

    Considering that the Drin Basin is of international importance, due to its morphology and biological diversity, including the habitats within its Sub-Basins that are vital for the conservation of numerous rare species, many of which are endemic and/or globally endangered

  7. 7.

    Considering environmental protection and conservation, and sustainable use of the natural resources of the Drin Basin, including water, to be an integral part of the development process aimed at meeting the needs of the present and future generations on an equitable basis

  8. 8.

    Recognising that sustainable development in the Drin Basin should include a balanced and reconciled development of vital economic sectors such as tourism, agriculture, energy production, fisheries and forestry

  9. 9.

    Acknowledging the need for sustainable and integrated management of the shared water resources in the Drin Basin and stressing our joint responsibility in this regard

  10. 10.

    Being guided by the principle of reasonable and equitable use of water resources

  11. 11.

    Convinced of the need for promoting adequate institutional arrangements and capacity building for sustainable and integrated water resources management in the Drin Basin

  12. 12.

    Recognising the need to coordinate management efforts across the Sub-Basins in this regard, while making use of the existing cooperation schemes that have been established for some of the Sub-Basins, namely Prespa Park Management Committee, Lake Ohrid Watershed Committee and Lake Skadar-Shkoder Commission

  13. 13.

    Convinced of the need of structured stakeholder involvement as part of sustainable basin management

  14. 14.

    Recognising the need for the Parties to meet the obligations arising from relevant international agreements, particularly the Convention on the Protection and Use of Transboundary Watercourses and International Lakes (17 March 1992 – hereinafter referred to as “UNECE Water Convention”) and its Protocols, the Convention on Wetlands of International Importance Especially as Waterfowl Habitat (Ramsar, 2 February 1971), the Convention for the Protection of the Mediterranean Sea Against Pollution (16 February 1976) and its Protocols and taking into consideration provisions of the UN Convention on the Law of the Non-Navigational Uses of International Watercourses (21 May 1997)

  15. 15.

    Conforming to the principles and legal framework of the European Union, in particular the Directive 2000/60/EC of the European Parliament and of the Council establishing a framework for the Community action in the field of water policy (23 October 2000 – hereinafter referred to as “EU WFD”)

  16. 16.

    Acknowledging the contribution of the UNECE, GWP-Med and the Petersberg Phase II/Athens Declaration Process, that support the Drin Dialogue, in reaching the signing of this MoU

Now, therefore, the Ministers and their representatives hereby enter into this Memorandum of Understanding (hereinafter, “MOU”), to be referred to as The Drin: A Strategic Shared Vision.

1.1.1.1.1 Article 1. Definitions
  1. 1.

    The “Sub-Basins” consist of the respective geographical areas of each of the following basins: the Prespa Lakes, Lake Ohrid, Lake Shkoder/Skadar (collectively, the “Three Lake Areas”); the Black Drin River (Crn Drim or Drini i Zi); the White Drin River (Beli Drin or Drini i Bardhë); the Drin River (Drim or Drini or Drini i madh) and the Buna/Bojana River.

  2. 2.

    The “Extended Transboundary Drin Basin” or “Drin Basin” is the geographical area consisting of the integrated geographical areas of all the Sub-Basins.

  3. 3.

    The “Parties” are the five water and/or environment competent Ministries of the Drin Riparians represented by the respective Ministers and their representatives.

  4. 4.

    The “Drin Core Group” (hereinafter, “DCG”) is the informal body established in 2009 to provide a forum for coordination among the Parties to enable communication and cooperation among them and the key stakeholders and for the coordination and the facilitation of implementation of the Drin Dialogue, comprising of representatives of the Parties, Prespa Park Management Committee, Lake Ohrid Watershed Committee, Lake Skadar-Shkoder Commission, United Nations Economic Commission for Europe (hereinafter referred to as the “UNECE”), Global Water Partnership – Mediterranean (hereinafter referred to as the “GWP-Med”) and Mediterranean Office for Environment Culture and Sustainable Development (hereinafter referred to as the “MIO-ECSDE”).

  5. 5.

    The “Drin Dialogue” is a coordinated and structured consultation process, initiated in 2009, among the Parties, the existing joint commissions/committees in some of the Sub-Basins and stakeholders, towards the development of a Shared Vision for the enhancement of transboundary cooperation and sustainable management of the Drin Basin in compliance with existing regional and international legislation in particular the provisions of the UNECE Water Convention, the EU Water Framework Directive (hereinafter referred to as the “EU WFD”) and other related multilateral agreements, facilitated by the UNECE and the GWP-Med and conducted within the frameworks of the UNECE Water Convention and the Petersberg Phase II/Athens Declaration Process.

1.1.1.1.2 Article 2. Objective

The Parties, through their Ministers and their representatives, commit to promote joint action for the coordinated integrated management of the shared water resources in the Drin Basin, as a means to safeguard and restore to the extent possible the ecosystems and the services they provide and to promote sustainable development across the Drin Basin.

1.1.1.1.3 Article 3. Common Concerns for Sustainable Development of the Drin Basin

The Parties hereby should undertake concrete actions to address problems identified as affecting sustainable development in the entire Drin Basin or in one or more of the Sub-Basins:

  1. (i)

    Improving access to comprehensive data and adequate information to fully understand the current state of the environment and the water resources and the hydrologic system (including surface, underground and coastal waters) as well as ecosystems of the Drin Basin

  2. (ii)

    Establish conditions for a sustainable use of water and other natural resources

  3. (iii)

    Develop cooperation and measures to minimise flooding especially in the lower parts of the Drin Basin

  4. (iv)

    Improve management and appropriate disposal of solid wastes

  5. (v)

    Decrease nutrient pollution deriving from untreated or poorly treated wastewater discharges and unsustainable agricultural practices

  6. (vi)

    Decrease pollution from hazardous substances such as heavy metals and pesticides

  7. (vii)

    Minimise effects of hydro-morphologic interventions that alter the nature of the hydrologic system and the supported ecosystems, resulting in their deterioration

1.1.1.1.4 Article 4. Priority Actions at National, Bilateral and/or Multilateral Levels
  1. 1.

    In the short term (to 2013), a set of minimum, “No Regret” measures should be initiated and carried out to promote integrated water resources management, also at national level, and facilitate enhancement of cooperation, including:

    1. a.

      Elaboration of coordination enhancement mechanisms among the Parties. The Drin Core Group will be used for this purpose.

    2. b.

      Enhancement of the knowledge basis about the Drin Basin that will allow planning of management and implementation of the EU WFD at national, Sub-Basin and Drin Basin level as well as enhanced cooperation among the Parties in the future. This may be achieved through the characterisation of the Drin Basin in accordance to the EU WFD and the analysis of the hydrological patterns integrating consideration of (i) the results achieved in the Three Lake Areas through previous and ongoing GEF-funded projects, (ii) the results of other ongoing and past relevant projects, (iii) the karstic nature of large sections of the Drin Basin, (iv) the surface/groundwater interaction patterns and conjunctive uses throughout the Drin Basin and (v) the coastal ecosystems, transitional waters and shallow marine environment. The characterisation of each Sub-Basin should be done either at the national level or through bilateral or multilateral coordination or cooperation on the basis of related existing agreements among the Parties concerning the management of each Sub-Basin. This information will be available to all Parties through the system indicated in point 4.1.c and potentially in the future through this indicated in point 4.2.d.

    3. c.

      Improvement of information exchange through the establishment of a system for regular exchange of relevant information among the competent authorities of each Party.

    4. d.

      Enhancement of cooperation in the field of flood risk preparedness, management and mutual support. This may be achieved through the preparation of different options for the establishment of cooperation at technical level in this regard, by a working group comprising of representatives of the competent authorities of the Parties under the coordination of the Drin Core Group.

    5. e.

      Institutional strengthening in the field of integrated water resources management targeting managers; practitioners; relevant officers of national, regional and local authorities; other stakeholders, etc. Towards this end, capacity building activities could be foreseen in fields of priority such as (i) integrated basin planning and management in accordance with the EU WFD; (ii) practices of transboundary water cooperation in accordance to the UNECE Water Convention; (iii) GIS and spatial planning; (iv) Environmental Impact Assessments and industrial site inspections; (v) flood management; (vi) natural wastewater treatment systems; (vii) best agricultural practices; (viii) avoidance and containment of invasive species; (ix) environmental monitoring system design and management; (x) enforcement of water quality, water abstractions, recharge area protection and biodiversity regulations; (xii) groundwater management; and (xiii) sustainable tourism.

    6. f.

      Promotion of public participation and stakeholder’s engagement. This may be achieved through the preparation and implementation of a Stakeholders Involvement Plan.

  2. 2.

    In the medium term (till 2015), actions undertaken should allow the establishment of instruments to be used for the sustainable management of water resources in the Drin Basin, including:

    1. a.

      Achievement of a science-based consensus, among the Drin Riparians, on key (Drin Basin) transboundary priorities including climate change scenarios, and also main drivers of change and indicators of sustainable development for the basin, based on the knowledge basis established (see 4.1.b. above)

    2. b.

      Preparation of an elaborated water balance for the Drin Basin as a useful decision support tool at national and transboundary levels

    3. c.

      Establishment of a harmonised Drin Basin Water Monitoring Program compatible with the UNECE Guidelines on Monitoring and Assessment of Transboundary Rivers, the relevant provisions of the EU WFD and the Shared Environmental Information System (SEIS) of the EEA

    4. d.

      Making use of the efforts described under 4.1.c. and establishment of an Information Management System (IMS) that will enable authorities to collect, store and share data and information produced through the Drin Basin Water Monitoring Program

    5. e.

      Establishment of basin-wide cooperative management on the basis of an agreement among the Parties and the establishment of a Basin Commission

  3. 3.

    In the long term (after 2016), the instruments that will allow the Parties to work towards sustainable management of the water resources in the Drin Basin are expected to be in place, including:

    1. a.

      Development of a Drin Basin Management Plan in accordance with the EU WFD and the UNECE Water Convention that will serve as the guidance document for the development and implementation of river/lake basin management plans for each of the Sub-Basins at national and transboundary level in accordance with the bilateral and multilateral agreements among the Drin Riparians

1.1.1.1.5 Article 5. Implementation and Monitoring
  1. 1.

    Pursuant to point 4.1.a, the mandate of the DCG is prolonged and expanded to facilitate communication and cooperation among the Parties for the implementation of the provisions of the present MoU. The functions and responsibilities of the DCG are defined in the Annex to this MoU.

  2. 2.

    Understanding the need for the implementation of the Strategic Shared Vision to reflect the views of the stakeholders, the Parties call for an annual meeting of stakeholders from the Drin Riparians and appreciate and accept the offer of UNECE and GWP-Med to facilitate its organisation.

  3. 3.

    Aiming at the enhanced and structured engagement of stakeholders in the implementation of the MoU, the Parties encourage the establishment of the “Drin Water Partnership” as a mechanism that will facilitate (a) awareness raising, (b) information exchange, (c) communication, (d) capacity building and (e) consultation and active participation if need be.

  4. 4.

    The Parties request GWP-Med in cooperation with MIO-ECSDE to elaborate on such a scheme and explore possibilities to establish under the auspices of GWP-Med such a Water Partnership.

  5. 5.

    The Parties ensure the participation of their respective governments, within their possibilities, to provide resources for the implementation of the provisions of this MoU and call upon and invite the EU, Global Environment Facility and other donors to join and provide support in this regard. The DCG shall initiate, stimulate and coordinate activities in this regard.

  6. 6.

    The Parties request the continuation of the assistance provided under the Petersberg Phase II/Athens Declaration Process, coordinated by the German and Greek governments and the World Bank, as well as under the UNECE Water Convention.

  7. 7.

    The Parties urge UNECE and the GWP-Med to continue providing their technical support and facilitation of the process.

1.1.1.1.6 Article 6. Meetings of the Parties

The Ministers responsible for the management of water resources and/or environment of the five Parties shall meet ANNUALLY to review progress in the implementation of the present MoU and its provisions.

1.1.1.1.7 Article 7. Legal Effect

The present MoU shall not affect the status of bilateral relationships and rights and obligations of the Parties under prior Memoranda of Understanding and/or all International Agreements concluded among them.

1.1.1.1.8 Article 8. Validity

The present MoU becomes valid from the date of signing.

1.1.1.1.9 Article 9. Withdrawal

A Party may withdraw from this MoU by giving written notice to every other Party, which shall become effective with respect to such Party 30 days after receipt of such notice by all Parties.

1.1.1.1.10 Article 10. Termination

This MoU may be terminated by a majority decision of the Parties. Such termination shall take effect six months after such a decision by the Parties.

Done at Tirana this twenty fifth day of November two thousand and eleven, in 5 copies, one for each Party, in the English language.

Annex. Setup, Functions and Responsibilities of the Drin Core Group

The setup, functions and responsibility of the DCG are the following:

  1. (i)

    The DCG will be comprised of the nominated representatives of the: (a) Parties (hereinafter referred at as the “representatives of the Parties”), (b) Prespa Park Management Committee, (c) Lake Ohrid Watershed Committee, (d) Lake Skadar-Shkoder Commission, (e) UNECE, (f) GWP-Med and (g) MIO-ECSDE.

  2. (ii)

    GWP-Med will serve as the Secretariat of the DCG providing technical and administrative support.

  3. (iii)

    The institutions and bodies participating in the DCG may alter their repreentatives in the DCG through a formal letter to the DCG Secretariat.

  4. (iv)

    The decisions of the DCG will be taken by the representatives of the Parties on the basis of consensus.

  5. (v)

    The DCG shall meet on a regular basis and not less than once per year. The next meeting of the DCG will be organised within 6 months from the signing of the MoU. The dates and the frequency of the meetings to follow will be decided by the DCG itself.

  6. (vi)

    A non-scheduled meeting of the DCG may be called at the request of any of the representatives of the Parties upon submission to the Secretariat of a written request including explanation of the reasons for such meeting, which shall be promptly distributed to all DCG members.

  7. (vii)

    The venue of the meetings will be decided by the DCG. The meetings shall be chaired by the representative of the Party in which they are held.

  8. (viii)

    The DCG shall amend as necessary in conformity to the aforementioned in this article and in accordance to the requirements stemming from the MoU, its internal rules of organisation and Terms of Reference (ToR) decided at Podgorica on 1 December 2009.

  9. (ix)

    Possible changes in the setup, functions and responsibility of DCG are decided by the meeting of the Parties.

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer Science+Business Media Dordrecht

About this chapter

Cite this chapter

Scoullos, M. (2012). Transboundary IWRM Attempts in the Mediterranean Emphasis on the Drin River Case and the Involvement of Stakeholders. In: Choukr-Allah, R., Ragab, R., Rodriguez-Clemente, R. (eds) Integrated Water Resources Management in the Mediterranean Region. Springer, Dordrecht. https://doi.org/10.1007/978-94-007-4756-2_1

Download citation

Publish with us

Policies and ethics