Complete fuzzy scheduling and fuzzy earned value management in construction projects

  • Published:
Journal of Zhejiang University SCIENCE A Aims and scope Submit manuscript

Abstract

This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value. It goes a step further than the existing literature: in the formulation of the fuzzy earned value we consider not only its duration, but also cost and production, and alternatives in the scheduling between the earliest and latest times. The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers. Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology. The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut, adapting it to the specific circumstances of the project.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • Anbari, F.T., 2003. Earned value project management: Methods and extensions. Project Management Journal, 34(4): 12–23.

    Google Scholar 

  • Bonnai, P., Gourc, D., Lacoste, G., 2004. Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1):114–123.

    Article  Google Scholar 

  • Buckley, J.J., Eslami, E., Feuring, T., 2002. Fuzzy mathematics in Economics and Engineering: Studies in Fuzziness and Soft Computing. Physica-Verlag, Heidelberg, Germany.

    MATH  Google Scholar 

  • Chanas, S., Kambourowski, J., 1981. The use of fuzzy variables in PERT. Fuzzy Sets and Systems, 5(1):11–19. [doi:10.1016/0165-0114(81)90030-0]

    Article  MATH  MathSciNet  Google Scholar 

  • Chen, C.T., Huang, S.F., 2007. Applying fuzzy method for measuring criticality in project network. Information Sciences, 177:2448–2458. [doi:10.1016/j.ins.2007.01.035]

    Article  MATH  Google Scholar 

  • Fleming, Q.W., Koppelman, J.M., 1998. Earned value project management. The Journal of Defense Software Engineering, 16(1):19–23.

    Google Scholar 

  • Kuchta, D., 2005. Fuzzyfication of the earned value method. WSEAS Transactions on Systems, 4(12):2222–2237.

    Google Scholar 

  • Laviolette, M., Seaman, J.W., Barrett, J.D., Woodall, W.H., 1995. A probabilistic and statistical view of fuzzy methods. Technometrics, 37(3):249–261.

    Article  MATH  Google Scholar 

  • Lawry, J., 2001. An alternative approach to computing with words. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 9:3–16. [doi:10.1142/S0218488501000958]

    Article  MATH  MathSciNet  Google Scholar 

  • Lipke, W., 2003. Schedule is Different. The Measurable News, March & Summer, p.31–34. Available from http://www.earnedschedule.com/Docs/Schedule%20is%20Different.pdf [Accessed on May 20, 2011].

  • Lipke, W., Zwikael, O., Henderson, K., Anbari, F.T., 2009. Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27(4):400–407. [doi:10.1016/j.ijproman.2008.02.009]

    Article  Google Scholar 

  • Liu, Y.C., Yang, S.M., Lin, Y.T., 2010. Fuzzy finish time modeling for project scheduling. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 12(11):946–952. [doi:10.1631/jzus.A10001115]

    Article  Google Scholar 

  • Moslemi, N.L., Salehipour, A., 2011. Evaluating fuzzy earned value indices and estimates by applying alpha cuts. Expert Systems with Applications, 38(7):8193–8198. [doi:10.1016/j.eswa.2010.12.165]

    Article  Google Scholar 

  • Moslemi, N.L., Shadrokh, S., Salehipour, A., 2011. A fuzzy approach for the earned value management. International Journal of Project Management, 29(6):764–772. [doi:10.1016/j.ijproman.2010.07.012]

    Article  Google Scholar 

  • Noori, S., Bagherpour, M., Zareei, A., 2008. Applying fuzzy control charts in earned value analysis: A new application. World Applied Sciences Journal, 3(4):684–690.

    Google Scholar 

  • Pellicer, E., Pellicer, T.M., Catalá, J., 2009. An integrated control system for SMEs in the construction industry. Revista de la Construcción, 8(2):4–17.

    Google Scholar 

  • Ponz-Tienda, J.L., 2010. Robust GRCPSP based on Production Processes for Construction Projects. PhD Thesis, Universitat Politècnica de València, Valencia (in Spanish).

    Google Scholar 

  • Prade, H., 1979. Using fuzzy set theory in a scheduling problem: A case study. Fuzzy Sets and Systems, 2(2):153–165. [doi:10.1016/0165-0114(79)90022-8]

    Article  MATH  Google Scholar 

  • Shipley, M., Korvin, A., Omer, K., 1996. A fuzzy logic approach for determining expected values: A project management application. The Journal of the Operational Research Society, 47(4):562–569.

    MATH  Google Scholar 

  • Wang, J., Hao, J., 2007. Fuzzy linguistic PERT. IEEE Transactions on Fuzzy Systems, 15(2):133–144. [doi:10.1109/TFUZZ.2006.879975]

    Article  Google Scholar 

  • Yao, J.S., Wu, K.M., 2000. Ranking fuzzy numbers based on decomposition principle and signed distance. Fuzzy Sets and Systems, 116(2):275–288. [doi:10.1016/S0165-0114(98)00122-5]

    Article  MATH  MathSciNet  Google Scholar 

  • Zadeh, L.A., 1965. Fuzzy sets. Information and Control, 8(3):338–353. [doi:10.1016/S0019-9958(65)90241-X]

    Article  MATH  MathSciNet  Google Scholar 

  • Zadeh, L.A., 1975. The concept of a linguistic variable and its application to approximate reasoning. Part I. Information Sciences, 8(3):199–249. [doi:10.1016/0020-0255(75)90036-5]

    Article  MathSciNet  Google Scholar 

  • Zadeh, L.A., 1995. Discussion: Probability theory and fuzzy logic are complementary rather than competitive. Technometrics, 37(3):271–276.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Víctor Yepes.

Additional information

Project partially supported by the Spanish Ministry of Science and Innovation (No. BIA2011-23602), and the European Community with the European Regional Development Fund (FEDER), Spain

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ponz-Tienda, J.L., Pellicer, E. & Yepes, V. Complete fuzzy scheduling and fuzzy earned value management in construction projects. J. Zhejiang Univ. Sci. A 13, 56–68 (2012). https://doi.org/10.1631/jzus.A1100160

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1631/jzus.A1100160

Key words

CLC

Navigation