Abstract
Existing methods of pushback (phase) design are reviewed in the context of “gap” problems, a term used to describe inconsistent sizes between successive pushbacks. Such gap problems lead to suboptimal open pit mining designs in terms of maximizing net present value. Methods such as the Lerchs-Grossman algorithm, network flow techniques, the fundamental tree algorithm, and Seymour’s parameterized pit algorithm are examined to see how they can be used to produce pushback designs and how they address gap issues. Areas of current and future research on producing pushbacks with a constrained size to help eliminate gap problems are discussed. A framework for incorporating discounting at the time of pushback design is proposed, which can lead to mine designs with increased NPV.
Similar content being viewed by others
References
Farrelly, C. and Dimitrakopoulos, R., Recoverable Reserves and Support Effects in Optimizing Open Pit Mine Design, International Journal of Surface Mining, 2002, vol. 16, no. 3.
Dowd, P.A., Risk in Minerals Projects: Analysis, Perception and Management, Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 1997, vol. 106.
Dimitrakopoulos, R., Farrelly, C.T., and Godoy, M.C., Moving Forward from Traditional Optimization: Grade Uncertainty and Risk Effects in Open-Pit Design, Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 2002, vol. 111.
Godoy, M.C., The Effective Management of Geological Risk in Long-Term Production Scheduling of Open Pit Mines, PhD Thesis, The University of Quensland, Brisbane, Qld, Australia, 2003.
Godoy, M.C. and Dimitrakopoulos, R., Managing Risk and Waste Mining in Long-Term Production Scheduling, SME Transactions, 2004, vol. 316.
Zuckerberg, M., J. van der Riet, Malajczuk, W., and Stone, P., Optimal Life-of-Mine Scheduling for a Bauxite Mine, J. Mining Science, 2011, vol. 47, no. 2, pp. 158–165.
Locchi, L., Carter, P., and Stone, P., Sequence Optimization in Longwall Coal Mining, J. Mining Science, 2011, vol. 47, no. 2, pp. 151–157.
Whittle, J., A Decade of Open Pit Mine Planning and Optimisation-The Craft of Turning Algorithms Into Packages, APCOM’99 Computer Applications in the Mineral Industries 28th International Symposum, Colorado School of Mines, Golden, Co, USA, 1999.
Dimitrakopoulos, R., Stochastic Optimization for Strategic Mine Planning: A Decade of Developments, J. Mining Science, 2011, vol. 47, no. 2, pp. 138–150.
Lerchs, H. and Grossman, I.F., Optimum Design of Open Pit Mines, Joint CORS and ORSA Conference, Montreal: Canadian Institute of Mining and Metallurgy, 1965.
Zhao, Y. and Kim, Y.C., A New Optimum Pit Limit Design Algorithm, APCOM’92 Computer Applications in the Mineral Industries 28th International Symposum, 1992.
Bondy, J.A. and Murty, U.S.R., Graph Theory with Applications, North-Holland, 1976.
Seymour, F., Pit Limit Parametrization from Modified 3D Lerchs-Grossmann Algorithm, Society of Mining, Metalurgy and Exploration, Manuscript, 1994.
Picard, J.C., Maximal Closure of a Graph and Applications to Combinatorial Problems, Management Science, 1976, vol. 22.
Hochbaum, D. and Chen, A., Improved Planning for the Open-Pit Mining Problem, Operations Research, 2000, vol. 48, no. 6.
Hochbaum, D., A New-Old Algorithm for Minimum-Cut and Maximum-Flow in Closure Graphs, Networks, 2001, vol. 37, no. 4.
Muir, D.C.W., Pseudoflow, New Life for Lerchs-Grossman Pit Optimisation, in: Orebody Modelling and Strategic Mine Planning, AusIMM Spectrum Series 14, 2007.
Gallo, G., Grigoriadis, M.D., and Tarjan, R.E., A Fast Parametric Maximum Flow Algorithm and Applications, SIAM Journal on Computing, 1989, vol. 18, no. 2.
Dagdelen, K. and Johnson, T.B., Optimum Open Pit Mine Production Scheduling by Lagrangian Parametrization, in: APCOM’86 Computer Applications in the Mineral Industries, 1986.
Tachefine, B. and Soumis, F., Maximal Closure on a Graph with Resource Constraints, Computers and Operations Research, 1997, vol. 24, no. 10.
Ramazan, S. and Dagdelen, K., A New Pushback Design Algorithm in Open Pit Mining, Proc. 17th Int. Symposium on Mine Planning and Equipment Selection, Calgary, Canada, 1998.
Stone, P., Froyland, G., Menabde, M., Law, B., Pasyar, R., and Monkhouse, P., Blasor-Blended Iron Ore Mine Planning Optimization at Yandi, Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, The Australian Institute of Mining and Metallurgy, Spectrum Series 14, 2007.
Boland, N., Dumitrescu, I., Froyland, G., and Gleixner, A.M., LP-Based Disaggregation Approaches to Solving the Open Pit Mining Production Scheduling Problem with Block Processing Selectivity, Computers and Operations Research, 2009, vol. 36, no. 4.
Rossi, M., Improving the Estimates of Recoverable Reserves, Mining Engineering, January, 1999.
Akaike, A., Strategic Planning of Long-Term Production Schedule Using 4D Network Relaxation Method, PhD Disertation, Colorado School of Mines, Eastwood, Co, 1999.
Ramazan, S., The New Fundamental Tree Algorithm for Production Scheduling of Open Pit Mines, European Journal of Operational Research, 2007, vol. 177, no. 2.
Crama, Y. and Mazzola, J.B., Valid Inequalities and Facets for a Hypergraph Model of the Nonlinear Knapsack and FMS Part-Selection Problems, Annals of Operations Research, 1995, vol. 58.
Bley, A., Boland, N., Fricke, C., and Froyland, G., A Strengthened Formulation and Cutting Planes for the Open Pit Mine Production Scheduling Problem, Computers and Operations Research, 2010, vol. 37, no. 9.
Vazirani, V.V., Primal-Dual Schema Based Approximation Algorithms, Theoretical Aspects of Computer Science: Advanced Lectures, 2002.
Tolwinski, B. and Underwood, R., A Scheduling Algorithm for Open Pit Mines, IMA Journal of Mathematics Applied in Business & Industry 7:247–270.
Bienstock, D. and Zuckerberg, M., Solving LP Relaxations of Large-Scale Precedence Constrained Problems. Integer Programming and Combinatorial Optimization, Lecture Notes in Computer Science, 2010, vol. 6080.
Caccetta, L. and Hill, S.P., An Application of Branch and Cut to Open Pit Mine Scheduling, J. Global Optimization, 2003, vol. 27, nos. 2–3.
Chicoisne, R., Espinoza, D., Goycoolea, M., Moreno, E., and Rubio, E., A New Algorithm for the Open-Pit Mine Production Scheduling Problem, Operations Research, 2012, vol. 60.
Cullenbine, C., Wood, R., and Newman A., A Sliding Time Window Heuristic for Open Pit Mine Block Sequencing, Optimization Letters, 2011, 5.
Ferland, J.A., Amaya, J., and Djuimo, M.S., Application of a Particle Swarm Algorithm to the Capacitated Open Pit Mining Problem, Autonomous Robots and Agents, Mukhopadhyay S. and Sen Gupta G. (Eds.), Springer-Verlag, 2007.
Lamghari, A. and Dimitrakopoulos, R., A Diversified Tabu Search Approach for the Open-Pit Mine Production Scheduling Problem with Metal Uncertainty, European Journal of Operational Research, 2012, 222.
Lamghari, A., Dimitrakopoulos, R., and Ferland, J.A., A Variable Neighborhood Descent Algorithm for The Open-Pit Mine Production Scheduling Problem with Metal Uncertainty, J. Operational Research Society, doi:10.1057/jors.2013.81, 2013.
Ramazan, S. and Dimitrakopoulos, R., Recent Applications of Operations Research in Open Pit Mining, Transactions of the Society for Mining, Metallurgy and Exploration, 2004, vol. 316.
Dantzig, A. and Wolfe, P., The Decomposition Principle for Linear Programs, Operations Research, 1960, vol. 8.
Peattie, R. and Dimitrakopoulos, R., Forecasting Recoverable Ore Reserves and Their Uncertainty at Morila Gold Deposit, Mali: An Efficient Simulation Approach and Future Grade Control Drilling, Mathematical Geosciences, 2013, vol. 45, no. 8.
Strebelle, S. and Cavelius, C., Solving Speed and Memory Issues in Multiple-Point Statistics Simulation Program SNESIM, Mathematical Geosciences, 2014, vol. 46, no. 2.
Kolbjørnsen, O., Stien, M., Kjønsberg, H., Fjellvoll B., and Abrahamsen, P., Using Multiple Grids in Markov Mesh Facies Modeling, Mathematical Geosciences, 2014, vol. 46, no. 2.
Dimitrakopoulos, R., Stochastic Optimization for Strategic Mine Planning: A Decade of Developments, J. Mining Science, 2011, vol. 47, no. 2, pp. 138–150.
Ramazan, S. and Dimitrakopoulos, R., Production Scheduling with Uncertain Supply: A New Solution to The Open Pit Mining Problem, Optimization and Engineering, DOI 10.1007/s11081-012-9186-2, 2012.
Birge, J.R. and Louveaux, F., Introduction to Stochastic Programming, Springer-Verlag, New York, 1997.
Dimitrakopoulos, R. and Jewbali, A., Joint Stochastic Optimization of Short- and Long-Term Mine Production Planning: Method and Application in a Large Operating Gold Mine, IMM Transactions, Mining Technology, 2013, vol. 122, no. 2.
Albor, F. and Dimitrakopoulos, R., Algorithmic Approach to Pushback Design Based on Stochastic Programming: Method, Application and Comparisons, IMM Transactions, Mining Technology, 2010, vol. 119.
Goodfellow, R. and Dimitrakopoulos, R., Algorithmic Integration of Geological Uncertainty in Pushback Designs for Complex Multiprocess Open Pit Mines, IMM Transactions, Mining Technology, 2013, vol. 122.
Montiel, L. and Dimitrakopoulos, R., Stochastic Mine Production Scheduling with Multiple Processes: Application at Escondida Norte, Chile, J. Mining Science, 2013, vol. 49, no. 4, pp.583–597.
Boland, N., Dumitrescu, I., and Froyland, G., A Multistage Stochastic Programming Approach to Open Pit Mine Production Scheduling with Uncertain Geology, Optimization Online. Available at: http://www.optimization-online.org/DB_FILE/2008/10/2123.pdf, 2008.
Asad, M.W.A. and Dimitrakopoulos, R., Implementing a Parametric Maximum Flow Algorithm for Optimal Open Pit Mine Design under Uncertain Supply and Demand, Journal of the Operational Research Society, DOI:10.1057/jors.2012.26, 2012.
Whittle, G., Global Asset Optimization, Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, The Australian Institute of Mining and Metallurgy, Spectrum Series 14, 2nd Edition, 2007.
De Lara, M. and Doyen, L., Sustainable Management of Natural Resources-Mathematical Models and Methods, Springer, Berlin, 2008.
Author information
Authors and Affiliations
Corresponding author
Additional information
Original Russian Text © C. Meagher, R. Dimitrakopoulos, D. Avis, 2014, published in Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, 2014, No. 3, pp. 96–117.
Rights and permissions
About this article
Cite this article
Meagher, C., Dimitrakopoulos, R. & Avis, D. Optimized open pit mine design, pushbacks and the gap problem—a review. J Min Sci 50, 508–526 (2014). https://doi.org/10.1134/S1062739114030132
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S1062739114030132