Abstract
The diverse causes and styles, the frequency and the losses arising from five Australian floods in 1998 are reviewed in this paper. Though mostly rare, the floods were not as unprecedented as commonly supposed. Damages to agriculture and infrastructure were significant, and probably over 10,000 houses experienced over-floor inundation. Key lessons include: the need for detailed damage assessments as a basis for damage reduction, the need to maximise safety and minimise property exposure at caravan parks, and the need for floodplain management strategies that better address both existing and future risk. A greater recognition of the distinctive nature of each flood event is required for the improvement of official and unofficial flood warning systems. Educators need to address the dynamic nature of flood awareness, as it declines over time, and as it varies from one individual to the next. Insurers need to adopt incentives for risk-reducing behaviour, so that efforts to mitigate damages are encouraged, not undermined.
Similar content being viewed by others
References
Anon.: 1998, Floods of Winter 1998, Director-General's Newsletter September, (http://www.ses.nsw.gov.au/news398.html#floods).
ARMCANZ (Agriculture and Resource Management Council of Australia and New Zealand): 2000, Floodplain Management in Australia: Best Practice Principles and Guidelines, CSIRO Publishing, Collingwood.
Barlow, F. T. H.: 1992, Katherine Floodplain Management Study, Volume 1, Power and Water Authority.
Berry, L.: 1998, 1998 Gulf Flood Report: Prepared for Emergency Management Australia and Queensland Emergency Services Division, Centre for Disaster Studies, James Cook University, Cairns.
Blong, R.: 1998, Damage-the truth but not the whole truth, In: D. King and L. Berry (eds), Disaster Management, Crisis and Opportunity: Hazard Management and Disaster Preparedness in the Australasia and the Pacific Region, Centre for Disaster Studies, James Cook University, Cairns, pp. 46–58.
BOM (Bureau of Meteorology): 1998, Severe Weather and Flooding, North Queensland, January 1998, Bureau of Meteorology, Brisbane.
BOM (Bureau of Meteorology): 2000, Australian Climate Extremes of the 20th Century, (http://www.bom.gov.au/climate/c20thc/flood.shtml).
Burby, R., Beatley, T., Berke, P. R., Deyle, R. E., French, S. P., Godschalk, D. R., Kaiser, E. J., Kartez, J. D., May, P. J., Olshansky, R., Paterson, R. G., and Platt, R. H.: 1999, Unleashing the power of planning to create disaster-resistant communities, J. Am. Plann. Assoc. 65(3), 247–258.
Burn, D. H.: 1999, Perceptions of flood risk: a case study of the Red River flood of 1997, Water Resour. Res. 35(11), 3451–3458.
Coates, L.: 1999, Flood fatalities in Australia, 1788–1996, Aust. Geogr. 30(3), 391–408.
Cullen, P.: 1998, Our victims are treated like dirt, Illawarra Mercury Sat Aug 22 1998, 6–7.
Davidson, A. R.: 1981, Flooding in Wollongong, 1945–77: A Survey, Occasional Paper No. 30, Department of Geography, Royal Military College, Duntroon.
DPIE (Department of Primary Industry and Energy): 1992, Floodplain Management in Australia, Volume 2: Main Report, Australian Water Resources Council, Water Management Series No. 21, DPIE, Commonwealth of Australia, Australian Government Publishing Service, Canberra.
Dutton, M.: 2000, The 1949 Macleay River flood and its 50th anniversary commemoration in 1999, in 2000 Floodplain Management Conference, NSW Floodplain Management Authorities, pp. 167–175.
Elshaug, R.: 1998, Flood Stories from the 1998 Australia Day Flood, (http://www.katherinehigh. nt.edu.au/writers/floodstories.html).
Evans, J. and Bewick, B.: 1999, The Wollongong flash flood event, in August 1998 Wollongong Storms, The Institution of Engineers Australia (Sydney Division Water Engineering Panel), Sydney, unpaginated.
Gale, S. J. and Bainbridge, S.: 1994, Megafloods in inland eastern Australia, April 1990, Z. Geomorphol. 38(1), 1–11.
Gruntfest, E. and Huber, C. J.: 1991, Toward a comprehensive national assessment of flash flooding in the United States, Episodes 14(1), 26–35.
Gutierrez, F., Gutierrez, M., and Sancho, C.: 1998, Geomorphological and sedimentological analysis of a catastrophic flash flood in the Arás drainage basin (Central Pyrenees, Spain), Geomorphology 22(3–4), 265–283.
Handmer, J., Keys, C., and Elliott, J.: 1999, Achieving lasting change in multi-organizational tasks: the case of flood warnings in Australia, Appl. Geogr. 19(3), 179–197.
Hansford, P.: 1998, January 1998 Katherine Floods: Report on Water Damage Issues, Gutteridge, Haskins & Davey Pty Ltd, Darwin.
Hopkins, L. C. and Holland, G. J.: 1997, Australian heavy-rain days and associated east-coast cyclones: 1958–92, J. Climate 10(4), 621–635.
Joy, C. S.: 1993, The cost of flood damage in Nyngan, Climatic Change 25(3–4), 335–351.
Katherine Region of Writers: 1999, The Katherine's Comin' Down, Katherine Region of Writers, Katherine.
King, D.: 1998, Townsville Thuringowa Floods, January 1998: Post Disaster Household Survey, Centre for Disaster Studies, James Cook University, Cairns.
Lakes & Wilderness Tourism: 1998, Report on Flood Survey from East Gippsland Tourism Operators, Lakes & Wilderness Tourism, Lakes Entrance.
Lambley, D. and Cordery, I.: 1992, Caravan parks and the April/May 1988 New South Wales floods, Aust. Geographical Stud. 30(1), 43–50.
Lustig, T. and Irish, J.: 2000, What caused the losses from the Wollongong floods of August 1998?, in 2000 Floodplain Management Conference, NSW Floodplain Management Authorities, pp. 267–274.
Meunier, M.: 1990, La catastrophe du Grand Bornard: crue torrentielle du Borne le 14 juillet 1987, Rev. Geogr. Alp. 78, 103–114.
Nakken, M.: 1998, Inundated by uncertainty: flood risk in inland NSW, Natural Hazards Quarterly 4(4), 4.
Nott, J. and Price, D.: 1999, Waterfalls, floods and climate change: evidence from tropical Australia, Earth Planet. Sc. Lett. 171(2), 267–276.
NSW Government: 1986, Floodplain Development Manual, Public Works Department, NSW Government, Sydney.
NSW Government: 1999, Floodplain Management Manual (Draft), Department of Land and Water Conservation, NSW Government, Sydney.
NWS (National Weather Service): 1999, 1998 Flash Flood / River Flood Related Fatalities (http://www.nws.noaa.gov/om/severe_weather/flood98.pdf).
Opper, S.: 1999, Making flood warnings more effective: SES, council and community input into the development of flood warning systems and services, in 1999 Floodplain Management Conference, NSW Floodplain Management Authorities, unpaginated.
Palmer, G. and Jaycock, R.: 1998, Major floods in the Townsville/Herbert River region of North Queensland, In: D. King and L. Berry (eds), Disaster Management, Crisis and Opportunity: Hazard Management and Disaster Preparedness in the Australasia and the Pacific Region, Centre for Disaster Studies, James Cook University, Cairns, p. 102.
Pielke, R. A. Jr.: 1999, Nine fallacies of floods, Climatic Change 42(2), 413–438.
Project Team: 1999, 1998 Flood: The Road to Recovery in East Gippsland, Department of Natural Resources and Environment/Department of Human Services/East Gippsland Catchment Management Authority/East Gippsland Shire Council, Bairnsdale.
Quarantelli, E. L.: 1995, The Future is Not the Past Repeated: Projecting Disasters of the 21st Century from Present Trends, Preliminary Paper #229, Disaster Research Center, University of Delaware.
Reed, M.: 1998, A Time to Remember: Speech to Northern Territory Legislative Assembly, Tuesday 17 February 1998 (http://www.nt.gov.au/katherine/latest_news/mike_reed_speech_to_parlaiament.htm (sic)).
Renshaw, E. F.: 1961, The relationship between flood losses and flood-control benefits, In: G. F. White (ed.), Papers on Flood Problems, Department of Geography Research Paper No. 70, University of Chicago, Chicago, pp. 21–45.
Saynor, M. J. and Erskine, W. D.: 1993, Characteristics and implications of high-level slackwater deposits in the Fairlight Gorge, Nepean River, Australia, Aust. J. Mar. Fresh. Res. 44(5), 735–747.
Skertchly, A. and Skertchly, K.: 1999, The Katherine-Daly flood disaster 1998, Aust. J. Emerg. Manage. 14(1), 31–36, 50.
Smith, D. I.: 1986, Cost-effectiveness of flood warnings, In: D. I. Smith and J. W. Handmer (eds), Flood Warning in Australia: Policies, Institutions and Technology, Centre for Resource and Environmental Studies, Canberra, pp. 203–219.
Smith, D. I.: 1998, Water in Australia: Resources and Management, Oxford University Press, Oxford.
Water Studies Pty Ltd: 2000, Katherine River Flood Study, Department of Lands, Planning and Environment, Darwin (http://www.lpe.nt.gov.au/advis/water/KathFlood/dwnload.htm).
White, B.: 1998, The Katherine floods-a personal story, Aust. Insurance Institute J. 21(2), 10–13.
Woods, R. and Pinfold, A.: 1998, The Wollongong washout of '98, Bush Fire Bull. (Official Journal of the NSW Rural Fire Service) 20(3/4), 5–7.
Yeo, S. W.: 1998, Natural and Human Controls on Flood Damages in the Ba River Valley, Fiji, unpublished PhD thesis, Natural Hazards Research Centre, Macquarie University.
Yeo, S. W.: 1999, A review of Australian flood disasters in 1998, in Disaster Prevention for the 21st Century: Proceedings of the Australian Disaster Conference 1999, Emergency Management Australia, Canberra, pp. 287–292.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Yeo, S.W. Flooding in Australia: A Review of Events in 1998. Natural Hazards 25, 177–191 (2002). https://doi.org/10.1023/A:1013765303567
Issue Date:
DOI: https://doi.org/10.1023/A:1013765303567