Skip to main content
Log in

Remaining Service Life of Generating Sets and Replacement of Equipment

  • Published:
Power Technology and Engineering Aims and scope

Questions concerning assessment of the remaining service lives of generating sets, and equipment replacement are examined.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  1. STO 70238424.27.140.039–2009. Hydroelectric Power plants. Continuance of Service Life of Basic Equipment. Standards and Recommendations [in Russian].

  2. STO 1730282.27.010.002–2008. Assessment of Conformity in the Electric-Power Industry [in Russian].

  3. Building Code SO 153-34.20.501-2003. Rules Governing Technical Operation of Electric-Power Plants and Grids of the Russian Federation [in Russian], approved by order of the Ministry of Energy of the Russian Federation on 19 June 2003, No. 229.

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 2, February 2014, pp. 47 – 52.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Baikov, V.N., Nezametdinov, É.U. Remaining Service Life of Generating Sets and Replacement of Equipment. Power Technol Eng 48, 112–116 (2014). https://doi.org/10.1007/s10749-014-0493-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-014-0493-y

Keywords

Navigation