Abstract
As of 30th June 2013, according to the European Wind Energy Association, there are 1,939 offshore wind turbines, with a combined capacity of 6,040 MW. They are fully grid connected in European waters in 58 wind farms across 10 countries. About 70 % of the foundations used for wind energy are monopiles with a diameter up to 6 m. The monopiles are installed by using hammers. However, there are situations where the piles cannot be installed without the “driving and drilling technique”, above all in the glacial areas, where glacial tills, boulders or cobbles can be encountered. A new technology for supporting the installation of monopiles is the monopile-trench cutter. The following paper describes four onshore trench cutter case histories in hard geology. Based on several projects, a correlation between net cut performance and uniaxial compressive strength (UCS) values of the in situ rock is briefly described. The variation of the cut performance decreases logarithmically with increasing UCS values. However, the data showed are only based on projects already performed, and it is not possible to extrapolate the data for future projects in similar geological conditions. The findings of this paper want to show how the trench cutter technology might be a suitable technology for supporting monopile installation in difficult sea beds. Besides, the information contained in this manuscript wants to be an aid for contractors involved in offshore pile installation.
Similar content being viewed by others
References
Beckhaus K, Schmitz S, Schwarz W (2009) Deep cut-off walls constructed under dams with trench cutters. In: Bauer E, Semprich S, Zenz G (eds) Long term behaviour of dams, LTBD09: Proceedings of the 2nd international conference, Technischen Universität Graz, pp. 294–299
Bowles JE (2001) Foundation analysis and design. McGraw-Hill, New York
Brunner W, Bi A, Chang W, Zong DF (2011) Construction of the first cut-off wall by a low headroom trench cutter inside a tunnel in China. In: Proceedings of the 31st annual USSD conference San Diego, California, pp 663–674
Cardu M, Oreste P (2013) Productivity and working costs of modern trench-cutters for the construction of concrete diaphragms in an urban environment. Int J Min Reclam Environ. doi:10.1080/17480930.2013.795340
Der Norske Veritas AS (2013) Design of offshore wind turbine structures. Standard DNV-OS-J101
Douglas-Westwood (2011) The world offshore wind market forecast 2012–2016. DW report
EWEA (2013a) The European offshore wind industry—key trends and statistics 1st half 2013. European Wind Energy Association
EWEA (2013b) The European offshore wind industry—key trends and statistics 2012. European Wind Energy Association
Folk PG (2008) Report on the Lianlong Project. http://www.tririver-venture.com/images/43-101ReportTriRiverVer4_clean.pdf. Accessed 20 Feb 2014
Kaiser MJ, Snyder BF (2012) Offshore wind energy cost modeling, green energy and technology. Springer, London
Malhotra S (2011) Selection, design and construction of offshore wind turbine foundations. In: Al-Bahadly I (ed) Wind turbines. InTech, Vienna, pp 231–264
McClelland B, Reifel MD (1986) Planning and design of fixed offshore platforms. Van Nostrand Reinhold Company, New York
Randolph M, Cassidy M, Gourvenec S, Erbrich C (2005) Challenges of offshore geotechnical engineering. In: Proceedings of the international conference on soil mechanics and geotechnical engineering, Osaka, Japan, A. A. Balkema Publishers, vol 1, pp. 123–176
Spagnoli G, Weixler L (2013a) Alternative offshore foundation installation methods. In: Proceedings of the offshore technology conference, OTC 23962. doi:10.4043/23962-MS
Spagnoli G, Weixler L (2013b) Support for offshore monopile installation through the trench cutter technology. Trans R Inst Nav Archit Part A 155:131–140
Spagnoli G, Weixler L, Finkenzeller S (2013) Drilling tools for installation of offshore wind foundations. Sea Technol 54:47–49
Stevens RS, Edward A, Turton TH (1982) Evaluating pile drivability for hard clay, very dense sand, and rock. In: Proceedings of the offshore technology conference, OTC 4205
Strandgaard T, Vandenbulcke L (2002) Driving mono-piles into glacial till. IBC’s Wind Power Europe
Tomlinson M, Woodward J (2007) Pile design and construction practice, 5th edn. CRC Press, Boca Raton
Weltman AJ, Healy PR (1978) Piling in boulder clay and other glacial tills. Construction Industry Research & Information Association (CIRIA), London
Acknowledgments
The authors wish to thank BAUER Maschinen GmbH for the permission to publish the data and Ms. Englert-Dougherty for the legal revision of the text. Thanks also to the anonymous reviewers, who considerably improved the quality of the manuscript.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Spagnoli, G., Bi, A. & Weixler, L. Trench Cutter Case Histories and Their Possible Application for Offshore Piles as Relieve Drilling. Geotech Geol Eng 32, 713–724 (2014). https://doi.org/10.1007/s10706-014-9747-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10706-014-9747-6