Skip to main content
Log in

A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount

  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

One of the most important aspects of multi-echelon inventory management deals with spare part; because, in the real world, it is more economic to repair equipment than change them. Also, it is possible, when more spare parts bought from an external supplier; seller gives quantity discount for all units. So, this paper considers a multi-echelon spare-part inventory system with backorders and quantity discount of external suppliers. Furthermore, a network approach is applied for modeling and solving these problems. Numerical example shows the efficiency of this algorithm.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7

Similar content being viewed by others

References

  • Ahuja, R. K., Magnanti, T. L., & Orlin, J. B. (1993). Network flows: Theory, algorithms and applications. Englewood Cliffs: Prentice-Hall Inc.

    Google Scholar 

  • Alfredsson, P. (1997). Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities. European Journal of Operational Research, 99, 584–595.

    Article  Google Scholar 

  • Díaz, A., & Fu, M. C. (1997). Models for multi-echelon repairable item inventory systems with limited repair capacity. European Journal of Operational Research, 97, 480–492.

    Article  Google Scholar 

  • Felderhof, J. P. K., & Konstantis, G. (1986). A three echelon spare parts provisioning model. European Journal of Operational Research, 24, 118–122.

    Article  Google Scholar 

  • Ford, L. R., & Fulkerson, D. R. (1962). Flows in networks. Princeton, NJ: Princeton University Press.

    Google Scholar 

  • Fordyce, J. M., & Webster, F. M. (1984). The Wagner Whitin algorithm made simple. Production and Inventory Management, 25(2), 21–27.

    Google Scholar 

  • Graves, S. C. (1985). A multi-echelon inventory model for a repairable item with one-for-one replenishment. Management Science, 31(10), 1247–1256.

    Article  Google Scholar 

  • Gupta, A., & Albright, S. C. (1992). Steady-state approximations for a multi-echelon multi-indentured repairable-item inventory system. European Journal of Operational Research, 62, 340–353.

    Article  Google Scholar 

  • Jiangsheng, S., Sujian, L., Fanggeng, Z., & Yanmei, L. (2007). Research on the multi-echelon inventory model of weapon equipment repairable valuable spare parts. In Automation and logistics, 2007 IEEE international conference, pp. 662–665.

  • Kalchschmidt, M., Zotteri, G., & Verganti, R. (2003). Inventory management in a multi-echelon spare parts supply chain. International Journal of Production Economics, 81–82, 397–413.

    Article  Google Scholar 

  • Lau, H. C., Song, H., See, C. T., & Cheng, S. Y. (2006). Evaluation of time-varying availability in multi-echelon spare parts systems with passivation. European Journal of Operational Research, 170, 91–105.

    Article  Google Scholar 

  • Levner, E., Perlman, Y., Cheng, T. C. E., & Levner, I. (2011). A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand. International Journal of Production Economics, 132, 43–51.

    Article  Google Scholar 

  • Liu, J. (2003). Algorithms for minimum-cost flows. Computer Science Department, The University of Western Ontario.

  • Perlman, Y., & Levner, I. (2010). Modeling multi-echelon multi-supplier repairable inventory systems with backorders. Journal of Service Science and Management, 3, 440–448.

    Article  Google Scholar 

  • Sleptchenko, A., Heijden, M. C., & Harten, A. (2002). Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems. International Journal of Production Economics, 79, 209–230.

    Article  Google Scholar 

  • Sleptchenko, A., Heijden, M. C., & Harten, A. (2005). Using repair priorities to reduce stock investment in spare part networks. European Journal of Operational Research, 163, 733–750.

    Article  Google Scholar 

  • Wagner, H., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management Science, 5, 89–96.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Parvaneh Samouei.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Samouei, P., Kheirkhah, A.S. & Fattahi, P. A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount. Ann Oper Res 226, 551–563 (2015). https://doi.org/10.1007/s10479-014-1718-z

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10479-014-1718-z

Keywords

Navigation