Abstract

The complex geological conditions of high arch dam sites could increase the difficulty in the design and construction processes, making the selection of the dam foundation surface a major subject in high dam engineering. This paper discusses some main problems in rock mass utilization for the foundation surface of high arch dams in medium or high geo-stress regions, including the rock mass classification and treatments for poor conditions. Poor conditions include the presence of large-scale discontinuities, asymmetry in the topography or geology and stress relaxation in high geo-stress zones. With respect to these main problems, six Chinese arch dams with heights of more than 200 m are selected to investigate the rock mass utilization. The special rock mass issues encountered by the foundations of the six dams and relevant treatment measures are discussed to describe the rock mass utilization characteristics for the arch dams. The key technical factors, such as excavation, reinforcement and structural optimization, are summarized to provide an effective reference for the rock mass utilization of high arch dam foundation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17
Fig. 18
Fig. 19
Fig. 20
Fig. 21

Similar content being viewed by others

References

  • Bai JG (2008) Study on excavation disturbed zone and ogee excavation scheme of high-stress dam foundation at deep valley. Dissertation, Tianjing University (in Chinese)

  • Barton N, Lien R, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):189–236. doi:10.1007/BF01239496

    Article  Google Scholar 

  • Bureau Of Reclamation (1977) Design criteria for concrete arch and gravity dams. A Water Resource Technical Publication

  • Chen S (2015) Chapter 8 Arch Dams Hydraulic Structures, Springer, pp397–496

  • Chen Y, Zhang L, Yang B, Dong J, Chen J (2015) Geomechanical model test on dam stability and application to Jinping High arch dam. Int J Rock Mech Min 76:1–9. doi:10.1016/j.ijrmms.2015.01.001

    Google Scholar 

  • Chinese National Standard (2008) GB 50487-2008 Code for engineering geological investigation of water resources and hydropower. China Planning Press, Beijing

    Google Scholar 

  • Chinese Professional Standard (2003) SL282-2003 design specification for concrete arch dams. China Water and Power Press

  • Chinese Professional Standard (2006) DL/T5346-2006 Design specification for concrete arch dam. China Electric Power Press

  • Duan S, Ren Q, Chen J, Li Q (2011) Study on the performance of arch dam influenced by relaxation of the foundations following excavation. Sci China Technol Sci 54(5):1177–1182. doi:10.1007/s11431-011-4345-9

    Article  Google Scholar 

  • Fan Q, Zhou S, Yang N (2015) Optimization design of foundation excavation for Xiluodu super-high arch dam in China. J Rock Mech Geotech Eng 7(2):120–135. doi:10.1016/j.jrmge.2015.03.001

    Article  Google Scholar 

  • Fei WP, Zhang L, Zhang R (2010) Experimental study on a geo-mechanical model of a high arch dam. Int J Rock Mech Min Sci 47(2):299–306. doi:10.1016/j.ijrmms.2009.12.005

    Article  Google Scholar 

  • Gong M, Qi S, Liu J (2010) Engineering geological problems related to high geo-stresses at the Jinping I Hydropower Station, Southwest China. Bull Eng Geol Environ 69(3):373–380. doi:10.1007/s10064-010-0267-1

    Article  Google Scholar 

  • Goodman RE (1989) Introduction to rock mechanics. John Wiley & Sons

  • Haftani M, Gheshmipour AA, Mehinrad A, Binazadeh K (2014) Geotechnical characteristics of Bakhtiary dam site, SW Iran: the highest double-curvature dam in the world. Bull Eng Geol Environ 73(2):479–492. doi:10.1007/s10064-013-0498-z

    Article  Google Scholar 

  • Huang R, Lin F, Yan M (2010) Deformation mechanism and stability evaluation for the left abutment slope of Jinping I Hydropower Station. Bull Eng Geol Environ 69(3):365–372. doi:10.1007/s10064-010-0283-1

    Article  Google Scholar 

  • Jiang Q, Feng XT, Hatzor YH, Hao XJ, Li SJ (2014) Mechanical anisotropy of columnar jointed basalts: an example from the Baihetan hydropower station, China. Eng Geol 175:35–45. doi:10.1016/j.enggeo.2014.03.019

    Article  Google Scholar 

  • Lin P, Wang RK (2011) Key problems of foundation failure, reinforcement and stability for superhigh arch dams. Chinese Journal of Rock Mechanics and Engineering 10:1945–1958 (in Chinese)

    Google Scholar 

  • Lin P, Kang S, Li Q, Wang R, Wang Z (2012) Evaluation of rock mass quality and stability analysis of Xiluodu arch dam under construction phase. Chin J Rock Mech Eng 31(10):2042–2052

    Google Scholar 

  • Novak P, Moffat AIB, Nalluri C et al (2006) Hydraulic structure. Taylor & Francis Ltd

  • Özsan A, Akın M (2002) Engineering geological assessment of the proposed Uruş dam, Turkey. Eng Geol 66(3):271–281. doi:10.1016/S0013-7952(02)00047-9

    Article  Google Scholar 

  • Özsan A, Karpuz C (1996) Geotechnical rock-mass evaluation of the Anamur dam site, Turkey. Eng Geol 42(1):65–70. doi:10.1016/0013-7952(95)00065-8

    Article  Google Scholar 

  • Pan YW, Liu YR (2014) Optimization ressearch on Baihetan arch dam foundation and pedestal [J]. Chin J Rock Mech Eng S1:2641–2648 (in Chinese)

    Google Scholar 

  • Qi SW, Wu FQ (2008) Characteristics of unloading fissures in dam’s base of Xiaowan hydropower station. Chin J Rock Mech Eng S1:2907–2912 (in Chinese)

    Google Scholar 

  • Qi S, Wu F, Yan F, Lan H (2004) Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station. Eng Geol 73(1):129–144. doi:10.1016/j.enggeo.2003.12.005

    Article  Google Scholar 

  • Qi S, Wu F, Zhou Y, Song Y, Gong M (2010) Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis. Bull Eng Geol Environ 69(3):333–342. doi:10.1007/s10064-010-0268-0

    Article  Google Scholar 

  • Ren QW, Li Q, Liu S (2012) Research advance in failure risk and local strength failure for high arch dams. Chin Sci Bull 57(36):4672–4682. doi:10.1007/s11434-012-5563-7

    Article  Google Scholar 

  • Romana M (2003). DMR (Dam Mass Rating). An adaptation of RMR géomechanics classification for use in dams Foundations. ISRM 2003-Technology roadmap for rock mechanics, J S Afr I Min Metall

  • Song SW, Xiang BY (2010) Stability analysis and reinforcement design of high and steep slopes with complex geology in abutment of Jinping Ihydropower station. Chin J Rock Mech Eng 03:442–458 (in Chinese)

    Google Scholar 

  • Sun J, Wang S (2000) Rock mechanics and rock engineering in China: developments and current state-of-the-art. Int J Rock Mech Min Sci 37(3):447–465. doi:10.1016/S1365-1609(99)00072-6

    Article  Google Scholar 

  • U.S. Army Corps of Engineers (1994) Arch dam design. Engineer Manual

  • Wang RK (2007) Analysis and evaluationof optimizing design for foundation excavation of super-high arch dam. Dissertation, Tsinghua University. (in Chinese)

  • Wang WM, Chen SH (2005) Study on reinforcement of resisting rock masses of Xiaowan arch dam abutment. Engineering Journal of Wuhan University 02:20–24 (in Chinese)

    Google Scholar 

  • Wang RK, Lin P (2008) Analysis and evaluation of optimizing design for foundation excavation of Xiluodu super-high arch dam. Chin J Rock Mech Eng 10:008 (in Chinese)

    Google Scholar 

  • Wang W, Ding J, Wang G, Zou L, Chen S (2011) Stability analysis of the temperature cracks in Xiaowan arch dam. Sci China Technol Sc 54(3):547–555. doi:10.1007/s11431-010-4280-1

    Article  Google Scholar 

  • Wei Y, Xu M, Wang W, Shi A, Tang M, Ye Z (2011) Feasibility of columnar jointed basalt used for high-arch dam foundation. J Rock Mech Geotech Eng 3:461–468. doi:10.3724/SP.J.1235.2011.00461

    Google Scholar 

  • Wu F, Liu J, Liu T, Zhuang H, Yan C (2009a) A method for assessment of excavation damaged zone (edz) of a rock mass and its application to a dam foundation case. Eng Geol 104(104):254–262. doi:10.1016/j.enggeo.2008.11.005

    Article  Google Scholar 

  • Wu F, Liu T, Liu J, Tang X (2009b) Excavation unloading destruction phenomena in rock dam foundations. Bull Eng Geol Environ 68(2):257–262. doi:10.1007/s10064-009-0202-5

    Article  Google Scholar 

  • Wu S, Shen M, Jian W (2010) Jinping hydropower project: main technical issues on engineering geology and rock mechanics. Bull Eng Geol Environ 69(3):325–332. doi:10.1007/s10064-010-0272-4

    Article  Google Scholar 

  • Xia M, Ren GM (2013) Characteristics and mechanism of concentrated unloading in bank slope of Yangqu hydropower station. J Geol Soc India 82(4):421–429. doi:10.1007/s12594-013-0169-5

    Article  Google Scholar 

  • Xu WY, Zhang JC, Wang W, Wang RB (2014a) Investigation into in situ stress fields in the asymmetric V-shaped river valley at the Wudongde dam site, southwest China. Bull Eng Geol Environ 73(2):465–477. doi:10.1007/s10064-013-0494-3

    Article  Google Scholar 

  • Xu NW, Dai F, Liang ZZ, Zhou Z, Sha C, Tang CA (2014b) The dynamic evaluation of rock slope stability considering the effects of microseismic damage. Rock Mech Rock Eng 47(2):621–642. doi:10.1007/s00603-013-0432-5

    Article  Google Scholar 

  • Yan DX, Xu WY, Zheng WT, Wang W, Shi AC, Wu GY (2011) Mechanical characteristics of columnar jointed rock at dam base of Baihetan hydropower station. J Cent South Univ 18:2157–2162. doi:10.1007/s11771-011-0957-2

    Article  Google Scholar 

  • Yan C, Yuan T, Wang K (2014) Unloading phenomena characteristics in brittle rock masses by a large-scale excavation in dam foundation. Open Civil Eng J 8(1):177–182. doi:10.2174/1874149501408010177

    Article  Google Scholar 

  • Yang Q, Liu Y, Chen Y, Zhou W (2008) Deformation reinforcement theory and its application to high arch dams. Sci China Ser E 51(2):32–47. doi:10.1007/s11431-008-6016-z

    Article  Google Scholar 

  • Zhang L, Liu YR, Yang Q (2014) Evaluation of reinforcement and analysis of stability of a high-arch dam based on geomechanical model testing. Rock Mech Rock Eng 48(2):803–818. doi:10.1007/s00603-014-0578-9

    Article  Google Scholar 

  • Zhao B, Xu WY, Meng YD, Liang GL (2015) Security monitoring of a large-scale and complex accumulation slope: an application in the Xiluodu hydropower station. Bull Eng Geol Environ 74(2):327–335. doi:10.1007/s10064-014-0637-1

    Article  Google Scholar 

  • Zhou WY, Lin P (2008) Reserch on concrete socket and peripheral joint for high arch dam foundation. Chin J Rock Mech Eng 10:1959–1967. doi:10.3321/j.issn:1000-6915.2008.10.002 (in Chinese)

    Google Scholar 

  • Zhou H, Wang GJ (2009) Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam. Rock Soil Mech 04:1175–1180 (in Chinese)

    Google Scholar 

  • Zhou WY, Yang RQ (1993) Study on the efficacy on grouting reinforcement of slightly weathered rock masses at the Ertan arch dam abutment. Chin J Rock Mech Eng 02:138–150 (in Chinese)

    Google Scholar 

  • Zhou JW, Yang XG, Xing HG, Xue YF, He G (2014) Assessment of the excavation-damaged zone in a tall rock slope using acoustic testing method. Geotech Geol Eng 32(4):1149–1158. doi:10.1007/s10706-014-9767-2

    Article  Google Scholar 

Download references

Acknowledgments

This work is supported by the National Key Basic Research Program (973 Program) of China (2011CB013501), the National Natural Science Foundation of China (51279135, 51279146) and the Science and Technology Promotion Project of MWR (Ministry of Water Resources) of China (TG1522). The authors wish to express their thanks to all supporters.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Wenbo Lu.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Shen, X., Niu, X., Lu, W. et al. Rock mass utilization for the foundation surfaces of high arch dams in medium or high geo-stress regions: a review. Bull Eng Geol Environ 76, 795–813 (2017). https://doi.org/10.1007/s10064-016-0892-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10064-016-0892-4

Keywords

Navigation