Abstract
Coal pillar stability is strongly influenced by the site-specific geological and geotechnical conditions. Many geological structures such as faults, joints, or rock intrusions can be detrimental to mining operations. In order to evaluate the performance of coal pillars under weak roof degraded by igneous rock intrusion, stress and deformation monitoring was conducted in the affected tailgate areas of Nos. 8208 and 8210 longwalls in Tashan coal mine, Shanxi Province, China. The measurements in the 8208 longwall tailgate showed that the mining-induced stresses in 38-m-wide coal chain pillars under the overburden depth of 300–500 m started to increase at about 100 m ahead of the 8208 longwall working face and reached its peak level at approximately 50 m ahead of the longwall face. The peak stress of 9.16 MPa occurred at the depth of 8–9 m into the pillar from the tailgate side wall. In comparison, disturbance of the headgate block pillar area was negligible, indicating the difference of abutment pressure distribution between the tailgate and headgate sites where the adjacent unmined longwall block carried most of the overburden load. However, when the longwall face passed the headgate monitoring site by 360–379 m, the pillar stress increased to a peak value of 21.4 MPa at the pillar depth of 13 m from the gob side mainly due to stress redistribution in the chain pillar. In contrast to the headgate, at the tailgate side, the adjacent goaf was the dominant triggering factor for high stress concentrations in the chain pillar. Convergence measurements in the tailgate during longwall mining further indicated the evolution characteristics of coal pillar deformation, clearly showing that the gateroad deformation is mainly induced by the longwall extraction it serves. When predicting the future pillar loads from the monitored data, two stress peaks appeared across the 38-m-wide tailgate coal pillar, which are separated by the lower stress area within the pillar center. This 10-m-wide elastic pillar core area indicates that the coal pillar may be narrowed to 30 m to improve coal recovery. The measurements further indicate that, if the headgate of the next panel can be developed after the adjacent gob becomes stable, the coal pillar width may be further reduced to 20 m. This study is applicable for the chain pillar design, the gateroad secondary support design ahead of the longwall mining face, and the gateroad preparation of the next longwall panel under similar geological and geotechnical conditions.
Similar content being viewed by others
References
Bieniawski ZT, Van Heerden WL (1975) The significance of in situ tests on large rock specimens. Int J Rock Mech Min Sci Geomech Abstr 12:101–113. doi:10.1016/0148-9062(75)90004-2
Buzzi O, Sieffert Y, Mendes J, Liu X, Giacomini A, Seedsman R (2014) Strength of an Australian coal under low confinement. Rock Mech Rock Eng 47:2265–2270. doi:10.1007/s00603-013-0493-5
Chen SJ, Guo WJ, Zhou H, Shen B, Liu JB (2014) Field investigation of long-term bearing capacity of strip coal pillars. Int J Rock Mech Min Sci 70:109–114. doi:10.1016/j.ijrmms.2014.02.022
Chugh YP, Pula O, Pytel WM (1990) Ultimate bearing capacity and settlement of coal pillar sub-strata. Int J Min Geol Eng 8:111–130. doi:10.1007/BF00920499
Darlington WJ, Ranjith PG, Choi SK (2011) The effect of specimen size on strength and other properties in laboratory testing of rock and rock-like cementitious brittle materials. Rock Mech Rock Eng 44:513–529. doi:10.1007/s00603-011-0161-6
Gale WJ (1998) Coal pillar design issues in longwall mining. In: Aziz N (ed) Coal operator’s conference, Wollongong, Australia. University of Wollongong & the Australasian Institute of Mining and Metallurgy, pp 133–146
González-Nicieza C, Álvarez-Fernández MI, Menéndez-Díaz A, Álvarez-Vigil AE (2006) A comparative analysis of pillar design methods and its application to marble mines. Rock Mech Rock Eng 39:421–444. doi:10.1007/s00603-005-0078-z
Haramy KY, Kneisley RO (1990) Yield pillars for stress control in longwall mines—case study. Int J Min Geol Eng 8:287–304. doi:10.1007/BF00920642
Hustrulid WA (1977) A review of coal pillar strength formulas. Rock Mech Rock Eng 10:111. doi:10.1007/BF01261806
Hustrulid WA, Bullock RL (2001) Underground mining methods. Society for Mining, Metallurgy, and Exploration, Littleton
Kaiser PK, Kim BH, Bewick RP, Valley B (2011) Rock mass strength at depth and implications for pillar design. Min Tech 120:170–179
Li W, Bai J, Peng S, Wang X, Xu Y (2015) Numerical modeling for yield pillar design: a case study. Rock Mech Rock Eng 48:305–318. doi:10.1007/s00603-013-0539-8
Mark C, Listak JM, Bieniawski ZT (1988) Yielding coal pillars—field measurements and analysis of design methods. In: Proceedings of the 29th US symposium on rock mechanics, Minneapolis, Minnesota, June 1988, pp 261–270
Mohan GM, Sheorey PR, Kushwaha A (2001) Numerical estimation of pillar strength in coal mines. Int J Rock Mech Min Sci 38:1185–1192. doi:10.1016/S1365-1609(01)00071-5
Newman DA (1989) In situ yield behaviour of a coal pillar. Int J Min Geol Eng 7:163–170. doi:10.1007/BF01554344
Peng SS (2008) Coal mine ground control. China University of Mining and Technology Press, Xuzhou
Poulsen BA, Shen B, Williams DJ, Huddlestone-Holmes C, Erarslan N, Qin J (2014) Strength reduction on saturation of coal and coal measures rocks with implications for coal pillar strength. Int J Rock Mech Min Sci 71:41–52. doi:10.1016/j.ijrmms.2014.06.012
Shabanimashcool M, Li CC (2012) Numerical modelling of longwall mining and stability analysis of the gates in a coal mine. Int J Rock Mech Min Sci 51:24–34. doi:10.1016/j.ijrmms.2012.02.002
Singh AK, Singh R, Maiti J, Kumar R, Mandal PK (2011) Assessment of mining induced stress development over coal pillars during depillaring. Int J Rock Mech Min Sci 48:805–818. doi:10.1016/j.ijrmms.2011.04.004
Wang SY, Sloan SW, Huang ML, Tang CA (2011) Numerical study of failure mechanism of serial and parallel rock pillars. Rock Mech Rock Eng 44:179–198. doi:10.1007/s00603-010-0116-3
Wang H, Jiang Y, Zhao Y, Zhu J, Liu S (2013) Numerical investigation of the dynamic mechanical state of a coal pillar during longwall mining panel extraction. Rock Mech Rock Eng 46:1211–1221. doi:10.1007/s00603-012-0337-8
Wei G (2014) Study on the width of the non-elastic zone in inclined coal pillar for strip mining. Int J Rock Mech Min Sci 72:304–310. doi:10.1016/j.ijrmms.2014.09.013
Acknowledgments
The study was partially financially supported by the National Natural Science Foundation of China (No. 51404168) and Fundamental Research Funds for the Central Universities (No. 106112015CDJXY240005), and the authors are thankful for the support from the Tashan coal mine during the field measurement. Special thanks go to Dr. Jan Nemcik, University of Wollongong, Australia, for the proofreading.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Yu, B., Zhang, Z., Kuang, T. et al. Stress Changes and Deformation Monitoring of Longwall Coal Pillars Located in Weak Ground. Rock Mech Rock Eng 49, 3293–3305 (2016). https://doi.org/10.1007/s00603-016-0970-8
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00603-016-0970-8