Skip to main content
Log in

A spatial estimation model for continuous rock mass characterization from the specific energy of a TBM

  • Published:
Rock Mechanics and Rock Engineering Aims and scope Submit manuscript

Summary

Basic principles of the theory of rock cutting with rolling disc cutters are used to appropriately reduce tunnel boring machine (TBM) logged data and compute the specific energy (SE) of rock cutting as a function of geometry of the cutterhead and operational parameters. A computational code written in Fortran 77 is used to perform Kriging predictions in a regular or irregular grid in 1D, 2D or 3D space based on sampled data referring to rock mass classification indices or TBM related parameters. This code is used here for three purposes, namely: (1) to filter raw data in order to establish a good correlation between SE and rock mass rating (RMR) (or tunnelling quality index Q) along the chainage of the tunnel, (2) to make prediction of RMR, Q or SE along the chainage of the tunnel from boreholes at the exploration phase and design stage of the tunnel, and (3) to make predictions of SE and RMR or Q ahead of the tunnel’s face during excavation of the tunnel based on SE estimations during excavation. The above tools are the basic constituents of an algorithm to continuously update the geotechnical model of the rock mass based on logged TBM data. Several cases were considered to illustrate the proposed methodology, namely: (a) data from a system of twin tunnels in Hong Kong, (b) data from three tunnels excavated in Northern Italy, and (c) data from the section Singuerlin-Esglesias of the Metro L9 tunnel in Barcelona.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • N Barton (2000) TBM tunnelling in jointed and faulted rock Balkema Rotterdam

    Google Scholar 

  • N Barton R Lien J Lunde (1974) ArticleTitleEngineering classification of rock masses for the design of rock support Rock Mech 6 189–236 Occurrence Handle10.1007/BF01239496

    Article  Google Scholar 

  • ZT Bieniawski (1973) ArticleTitleEngineering classification of jointed rock masses Trans S African Instn Civ Engrs 15 IssueID12 335–344

    Google Scholar 

  • K Fukui S Okubo (2006) ArticleTitleSome attempts for estimating rock strength and rock mass classification from cutting force and investigation of optimum operation, of tunnel boring machines Rock Mech Rock Engng 39 IssueID1 25–44 Occurrence Handle10.1007/s00603-005-0071-6

    Article  Google Scholar 

  • R Gertsch L Gertsch J Rostami (2007) ArticleTitleDisc cutting tests in Colorado Red Granite: implications for TBM performance prediction Int J Rock Mech Min Sci 44 238–246 Occurrence Handle10.1016/j.ijrmms.2006.07.007

    Article  Google Scholar 

  • Itasca Consulting Group Inc. (2002) FLAC3D, Fast Lagrangian Analysis of Continua in 3 Dimensions: User’s Guide. Minneapolis, Minnesota USA

  • AG Journel CHJ Huijbregts (1978) Mining geostatistics Academic Press London

    Google Scholar 

  • PK Kitanidis (1997) Introduction to Geostatistics: Applications in Hydrogeology Cambridge University Press United Kingdom

    Google Scholar 

  • HK Kutter H-P Sanio (1983) ArticleTitleDiscussion of paper by Snowdon RA, Ryley MD and Temporal J, “A study of disc cutting in selected British rocks” Int J Rock Mech Min Sci Geomech Abstr 19 107–121

    Google Scholar 

  • HK Kutter H-P Sanio (1982) Int J Rock Mech Min Sci Geomech Abstr 20 IssueID2 103–104

    Google Scholar 

  • Matlab 6.0 (2000) The Mathworks Inc., Natick, Massachusetts, USA

  • A Papoulis (1984) Probability, random variables and stochastic processes McGraw-Hill International Editions Singapore 576

    Google Scholar 

  • R Ribacchi A Lembo Fazio (2005) ArticleTitleInfluence of rock mass parameters on the performance of a TBM in a gneissic formation (Varzo Tunnel) Rock Mech. Rock Engng 38 IssueID2 105–127 Occurrence Handle10.1007/s00603-004-0032-5

    Article  Google Scholar 

  • Rostami J, Ozdemir L (1993) A New Model for Performance Prediction of Hard Rock TBMS. Chapter 3 in 1993 RETC PROCEEDINGS, 793–809

  • FF Roxborough HR Phillips (1975) ArticleTitleRock excavation by disc cutter Int J Rock Mech Min Sci Geomech Abstr 12 361–366 Occurrence Handle10.1016/0148-9062(75)90547-1

    Article  Google Scholar 

  • M Sapigni M Berti E Bethaz A Busillo G Cardone (2002) ArticleTitleTBM performance estimation using rock mass classifications Int J Rock Mech Min Sci 39 771–788 Occurrence Handle10.1016/S1365-1609(02)00069-2

    Article  Google Scholar 

  • M Stavropoulou G Exadaktylos G Saratsis (2007) ArticleTitleA combined three-dimensional geological-geostatistical-numerical model of underground excavations in rock Rock Mech Rock Engng 40 IssueID3 213–243 Occurrence Handle10.1007/s00603-006-0125-4

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to G. Exadaktylos.

Additional information

Correspondence: G. Exadaktylos, Department of Mineral Resources Engineering, Technical University of Crete, Chania, Greece

Rights and permissions

Reprints and permissions

About this article

Cite this article

Exadaktylos, G., Stavropoulou, M., Xiroudakis, G. et al. A spatial estimation model for continuous rock mass characterization from the specific energy of a TBM. Rock Mech Rock Eng 41, 797–834 (2008). https://doi.org/10.1007/s00603-007-0160-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00603-007-0160-9

Navigation