Abstract
In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed.
Zusammenfassung
In diesem Beitrag wird die Analyse des EOQ-Reparatur- und Entsorgungsproblems mit variablen Loszahlen für die Produktion und die Reparatur innerhalb eines Sammelzeitintervalls fortgesetzt. Die Kostenanalyse wird hier auf extreme Werte der Entsorgungsrate ausgedehnt und es wird gezeigt, daß die reine (bang-bang) Politik des vollständigen Verzichts auf Entsorgung (vollständige Reparatur) oder auf Reparatur (vollständige Entsorgung) die Mischstrategie von Entsorgung und Reparatur dominiert. Weiterhin wird das unterschiedliche Verhalten der minimalen Kosten, der optimalen Loszahlen, Losgrößen und Sammelzeitintervalle für geringe und große Entsorgungsraten diskutiert.
Similar content being viewed by others
References
Betz St (1995) Kostenorientierte Planung der Entsorgungslogistik, Z Planung, 321–339
Bogaschewski R (1995) Natürliche Umwelt und Produktion. Gabler, Wiesbaden
Dinkelbach W, Rosenberg O (1994) Erfolgs- und umweltorientierte Produktionstheorie. Springer-Verlag, Berlin
Dyckhoff H (1992) Betriebliche Produktion — Theoretische Grundlagen einer umweltorientierten Produktionswirtschaft. Springer-Verlag, Berlin
Gupta MC (1995) Environmental management and its impact on the operations function, Int J Oper & Dec Manag 15(8):34–51
Haasis H-D (1994) Planung und Steuerung emissionsarm zu betreibender industrieller Produktionssysteme. Physica-Verlag, Heidelberg
Kelle P, Silver EA (1989) Purchasing policy of new containers considering the random returns of previously issued containers, IIE Transactions 21(4):349–354
Laan EA van der, Dekker R, Ridder AAN, Salomon M (1994) An (s,Q) inventory model with remanufacturing and disposal, erscheint in: Int J Produc Econ, to appear
Laan EA van der, Salomon M, Dekker R (1995) Production planning and inventory control for remanufacturable durable products, Report 9531/A, Erasmus University Rotterdam
Richter K (1994) An EOQ repair and waste disposal model, Proceedings of the Eight International Working Seminar on Production Economics, Vol. 3, 83–91, Igls/Innsbruck
Richter K (1996) The extended EOQ repair and waste disposal model. Int J Produc Econ 45:443–447
Richter K (1996) The EOQ repair and waste disposal model with variable setup numbers. Eur J Oper Res 96:313–324
Richter K (1996) Modellierung von kombinierten Wiederverwendungs- und Entsorgungsprozessen. In: Wildemann H (eds): Produktions- und Zuliefernetzwerke. TCW Transfer-Centrum-Verlag, München, pp 279–291
Steven M (1994) Produktion und Umweltschutz. Gabler-Verlag, Wiesbaden
Thierry MC, Salomon M, Nunen JAEE van, Wassenhove LN van (1995) Strategic production and operations management issues in product recovery management, Calif Manag Rev 37(2):114–135
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Richter, K. Pure and mixed strategies for the EOQ repair and waste disposal problem. OR Spektrum 19, 123–129 (1997). https://doi.org/10.1007/BF01545511
Received:
Accepted:
Issue Date:
DOI: https://doi.org/10.1007/BF01545511