The effect of defense program uncertainty on cost, schedule, and capital investment

  • Published:
Journal of Productivity Analysis Aims and scope Submit manuscript

Abstract

Program instability, low levels of capital investment and uneconomical production rates have been recognized as significant problems in defense acquisition programs. In this paper, we use a dynamic programming model under uncertainty to investigate the relations among these problems. We show that capital investment and production rates that appear to be too low may be the result of cost minimizing responses by contractors to program instability. Attempts to change the level of capital investment or production rate on defense programs without regard to the nature of program instability may hinder efficient resource allocation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • Able, A.B. 1983. Optimal Investment under Uncertainty. American Economic Review, 73:228–233.

    Google Scholar 

  • Bemis, J.C. 1981. A Model for Examining the Cost Implications of Production Rate. Concepts: The Journal of Defense Systems Acquisitions Management 84–94.

  • Borsting, J.R. 1982. Decision-Making at the Top. Management Science, 28:341–351.

    Google Scholar 

  • Boyd, D.W., R.L. Phillips and S.G. Regulinski. 1982. A Model of Technology Selection by Cost Minimizing Producers. Management Science, 28:418–424.

    Google Scholar 

  • Cottle, R.L. and M.S. Wallace. 1983. Economic Effects of Non-Binding Constraints. Journal of Industrial Economics, 31:469–477.

    Google Scholar 

  • Cox, L.W. and J.S. Gansler. 1981. Evaluating the Impact of Quantity, Rate, and Competition. Concepts: The Journal of Defense Systems Acquisition Management, 29–53.

  • Department of Defense, Final Report of the Task Force on Acquisition Improvement, Washington, D.C.: The Department of Defense, December 23, 1981.

    Google Scholar 

  • Dietrich, J. K., and D.G. Heckerman. 1980. Uncertain Inflation and the Demand for Capital. Economic Inquiry, 18:461–471.

    Google Scholar 

  • Fisher, I.N. and G.R. Hall. 1967. Risk and the Aerospace Rate of Return. Rank Memorandum RM-5440-PR. Santa Monica, California: The Rand Corporation, December.

    Google Scholar 

  • Frisch, F.A.P. and D.D. Acher. 1981. Financing Defense Systems Programs, Concepts: The Journal of Defense Systems Acquisition Management, 4:7–28.

    Google Scholar 

  • General Accounting Office, Budget Reductions for FY1986: Balanced Budget and Emergency Deficit Control Act of 1985, (Report GAO/OCG-86–1), Washington, D.C.: The General Accounting Office, January 21, 1986.

    Google Scholar 

  • Gulledge, T.R., N.K. Womer and M.M. Tarimicilar. 1985. A Discrete Dynamic Optimization Model for Made-to-Order Cost Analysis. Decision Sciences, 16:73–90.

    Google Scholar 

  • Gulledge, T.R. and N.K. Womer. 1986. The Economics of Made-to-Order Production, Berlin: Springer-Verlag.

    Google Scholar 

  • Hartman, R. 1972. The Effects of Price and Cost Uncertainty on Investment. Journal of Economic Theory, 5:258–266.

    Google Scholar 

  • Hillier, R.S. and J.F. Shapiro. 1986. Optimal Capacity Expansion Planning When There Are Learning Effects. Management Science, 32:1153–1163.

    Google Scholar 

  • Large, J.P. and K.M.S. Gillespie. 1977. A Critique of Aircraft Airframe Cost Models. Rand Report R-2194-AF. Santa Monica, California: The Rand Corporation, September.

    Google Scholar 

  • Muth, J.F. 1986. Search Theory and the Manufacturing Progress Function. Management Science, 32:948–962.

    Google Scholar 

  • Smith, L.L. 1976. An Investigation of Changes in Direct Labor Requirements Resulting from Changes in Airframe Production Rate. Ph.D. Thesis, University of Oregon, Eugene, Oregon.

    Google Scholar 

  • Terasawa, K., J. Quirk, and N. K. Womer. 1989. Turbulence, Cost Escalation, and Capital Intensity Bias in Defense Contracting. Cost Analysis Applications of Economics and Operations Research, T. R. Gulledge and L. A. Litteral, ed., Berlin: Springer-Verlag, 97–116.

    Google Scholar 

  • Weidenbaum, M.L. 1967. The Military/Space Market: Intersection of the Public and Private Sectors. Department of Economics Working Paper 6712 (Washington University: St. Louis).

    Google Scholar 

  • Womer, N.K. 1984. Estimating Learning Curves from Aggregate Monthly Data. Management Science, 30:982–992.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

The refereeing process of this paper was handled through J.F. Muth.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Womer, N.K., Terasawa, K. The effect of defense program uncertainty on cost, schedule, and capital investment. J Prod Anal 1, 193–228 (1989). https://doi.org/10.1007/BF00158753

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00158753

Keywords

Navigation