KSCE Journal of Civil Engineering

, Volume 5, Issue 1, pp 43–49

Bridge management system development for a cable-stayed bridge

Structural Engineering

DOI: 10.1007/BF02830725

Cite this article as:
Kim, S. KSCE J Civ Eng (2001) 5: 43. doi:10.1007/BF02830725


The exclusive bridge management system for a special type of bridge, Seo-Hae Bridge, which is the largest cable-stayed type in this country, has been successfully developed and operated in bridge field. Bridge Management System (BMS) is generally classified into two categories based on its application: the global-purpose and exclusive type. The global-type is applied to overall bridge group in the road networks under a managing authority, while the exclusive type is for a specific single bridge. Since two types of system have different application field the system development strategy should also be different in its purpose and contents. The contents of Seo-Hae Bridge Management System (SHBMS) which is the first exclusive type system for a specific bridge is introduced in this paper.


bridge managentDMScable-stayed bridge

Copyright information

© KSCE and Springer jointly 2001

Authors and Affiliations

  1. 1.Korea Highway CorporationKorea