  1. 1.

    The energy-storage hydroelectric stations proposed by P. P. Khlopenkov can be regarded as an alternative to channel stations under favorable (for an ESHES) natural conditions and in the case of economic and ecological counterindications of the creation of large channel reservoirs.

     
  2. 2.

    As the technical economic studies showed, reconstruction of the Volga-Lenin HES to the Samara ESHES with lowering the design level of the Kuibyshev reservoir both by 10 m and 4 m is not expedient.

     
  3. 3.

    The creation of the upper reservoir of the ESHES in the Zhiguli Mountains under extremely difficult natural conditions is related to major complicated engineering works.

     

Copyright information