Turning a Problem into a Resource: Remediation and Waste Management at the Sillamäe Site, Estonia

  • Book
  • © 2000

Overview

Part of the book series: NATO Science Partnership Subseries: 1 (ASDT, volume 28)

This is a preview of subscription content, log in via an institution to check access.

Access this book

eBook USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Other ways to access

Licence this eBook for your library

Institutional subscriptions

Table of contents (32 chapters)

  1. Introductory Material: The Situation at Sillamäe

  2. Experience with Uranium Tailings in Other Countries

  3. Regulatory and Legal Issues

Keywords

About this book

In its present condition, the dam of the tailings pond is less stable than is recommended by international practice. A surveillance system has been established to observe both vertical and horizontal soil movement and the buildup of stresses in the soil. The stability of the dam depends primarily on erosion by shore processes and the consequent reduction of the counterbalance, as well as the reduction in strength of the Cambrian clay underlying the dam caused by creep and by water percolating to the bottom of the pond. The most critical need is to enlarge the counterbalance and to stop erosion. The surveillance system should be supplemented with a system of inclinometers. Monitoring of coastal processes should be continued. At present, the hydrodynamic stress on the dam is minimal because the pebble layer allows drainage of water out of the tailings pond and into the sea. The regulatory requirement to end emissions into the Baltic Sea must be met without causing undesirable hydrodynamic stresses on the dam. This could be done by covering the pond and diverting precipitation water. 9. References I. Report on Topographic-Geodetic Studies at the Tailings Pond. 1965, No. A-4-01187 (in Russian). 2. Report on Geotechnical Studies at the Tailings Pond of Plant PO Box 22. 1965, No. 64691 (in Russian). 3. Report on Topographic-Geodetic and Geotechnical Studies at the Thennal Power Plant's Ash Impoundment. 1976, No. 15740 (in Russian). 4. Technical Report on Topographic Planning of the Thennal Power Plant's Ash Impoundment. 1979, No.

Editors and Affiliations

  • Los Alamos National Laboratory, Los Alamos, USA

    Cheryl K. Rofer

  • ÖkoSil Ltd., Tallinn, Estonia

    Tõnis Kaasik

Bibliographic Information

  • Book Title: Turning a Problem into a Resource: Remediation and Waste Management at the Sillamäe Site, Estonia

  • Editors: Cheryl K. Rofer, Tõnis Kaasik

  • Series Title: NATO Science Partnership Subseries: 1

  • DOI: https://doi.org/10.1007/978-94-011-4092-8

  • Publisher: Springer Dordrecht

  • eBook Packages: Springer Book Archive

  • Copyright Information: Springer Science+Business Media Dordrecht 2000

  • Hardcover ISBN: 978-0-7923-6186-2Published: 31 August 2000

  • Softcover ISBN: 978-0-7923-6187-9Published: 31 August 2000

  • eBook ISBN: 978-94-011-4092-8Published: 06 December 2012

  • Series ISSN: 1389-1820

  • Edition Number: 1

  • Number of Pages: XVI, 277

  • Number of Illustrations: 22 b/w illustrations

  • Topics: Environmental Management, Waste Management/Waste Technology, Terrestrial Pollution, Ecology

Publish with us