Skip to main content
Log in

An early warning system for payloads’ operations in the European International Space Station (ISS) Columbus module

  • Original Paper
  • Published:
CEAS Space Journal Aims and scope Submit manuscript

Abstract

Since the Columbus module became part of the ISS in 2008, it provided research opportunities in special experiment facilities for fluid physics (e.g. for crystallization processes, emulsion stability), biology (housing, e.g. small plants and invertebrates) and human research (ageing process, osteoporosis, etc.). In addition, the Columbus Centre Aisle (ambient conditions, i.e. 18–27 °C at 965–1027 hPa) and external platforms (vacuum at − 270 °C) are available for all types of investigations in microgravity. Before an experiment or a payload is implemented and executed, it needs to be analysed if there are any conflicts with other experiments or payloads to be expected. The analyses cover all relevant aspects: mechanical issues, microgravity impact and requirements, data management, power availability, etc. A typical result of the microgravity (µg) analysis is that a µg-sensitive experiment cannot be operated simultaneously with a payload that uses a centrifuge. Results of the analyses are formulated as GuideLines and operational Constraints (GL&Cs). This paper presents different types of analyses including examples and parties involved. Furthermore, the impact of these GL&Cs on the operation community is highlighted. Finally, a new tool for the analyses of all mechanical aspects (using virtual reality) is introduced.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8

Similar content being viewed by others

References

  1. “COLUMBUS pressurized payloads interface requirements document”, COL-RIBRE-SPE-0164, issue: 2A, (2013)

  2. “COLUMBUS external payloads interface requirements document”, COL-RIBRE-SPE-0165, issue: 2A, (2015)

  3. Payload Verification Program Plan; VDS SSP 57011, issue: D (2009)

  4. Increment 55&56: Requirements document, ESA-ISS-COL-INC-RS-0026, issue: 6 (2017)

  5. Increment 55&56: Requirements document change notice #6, ESA-ISS-COL-IMO-RS-0043, issue: 1, (2017)

  6. Payload operations guidelines: and constraints-all flights, SSP 57516, issue: J

  7. GLC update memos, 5-5165-DC-17-xxx

  8. International space station vehicle capability report for increment 55 payloads, Contract # NAS15-10000 (DR SE-SEI-06) (2017)

  9. International Space Station Vehicle: capability report for increment 56 payloads, Contract # NAS15-10000 (DR SE-SEI-06) (2017)

  10. Payload Engineering Integration Verification Summary for NASA Payloads in Columbus Increment 55, memo # 5-5165-DC-17-0031 (I-55), Revision (2017)

  11. Payload engineering integration verification: summary for NASA payloads in columbus increment 56, memo # 5-5165-DC-17-00XX (I-56) (2018)

  12. Columbus: and payload complement mechanical configuration for increment 55&56, ESO-IT-RP-1062 [ME-00], issue: 2 Rev (2018)

  13. Pressurized payload work volumes: for increment 55&56, ESO-IT-AN-0872 [ME-02], Issue: 1, R, (2017)

  14. Columbus operations guidelines and constraints report for increment 56, ESO-IT-RP-1098, ISSUE 1 (2018)

  15. Virtual reality tool Columbus 4U I5758 v.04; Thales Alenia Space-Italy (TASI); (2018)

  16. Increment definition and requirements document: (IDRD] for increments 55 and 56, Annex 5: Payload Tactical Plan, ISS; SSP 56055_54056-ANX5, revision A (2018)

  17. Increment 56 ISS level stage analysis guidelines &: stage analysis guidelines and constraints report; contract no. NAS15-10000 (DRD SE-PI-02, SE-PI-05, SE-SE&I-07), revision A (2018)

  18. Increment definition and requirements document for: increments XX and YY Standard Blank Book; International Space Station Program; SSP 54004, revision, J (2018)

  19. Operations planning for the international space station; Lüttgens, R., Volpp, J. ESA Directorate for Technical and Operational Support, ESOC, Darmstadt, Germany; ESA Bulletin 94 (1998)

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. Bade.

Additional information

Publisher’s Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Bade, A., Wolf, E., Lühdorff, H. et al. An early warning system for payloads’ operations in the European International Space Station (ISS) Columbus module. CEAS Space J 11, 247–254 (2019). https://doi.org/10.1007/s12567-019-00240-4

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12567-019-00240-4

Keywords

Navigation