Skip to main content
Log in

Optimization of Design Solutions and Structural Improvement of the Main Facilities of the Ust-Srednekanskaya HPP

  • Published:
Power Technology and Engineering Aims and scope

The history of the design and construction of the Ust-Srednekanskaya HPP in the Magadan Region is briefly reviewed. The reasons for and results of design works intended to update the project documentation for the main facilities of the hydraulic project are described.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. Sh. Musaev.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’svo, No. 2, February 2022, pp. 12 – 21. https://doi.org/10.34231/EP.2022.95.99.002

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Musaev, A.S., Kabanov, N.V. & Kadushkina, Y.A. Optimization of Design Solutions and Structural Improvement of the Main Facilities of the Ust-Srednekanskaya HPP. Power Technol Eng 56, 196–204 (2022). https://doi.org/10.1007/s10749-023-01494-z

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-023-01494-z

Keywords

Navigation