Skip to main content
Log in

The model and algorithm of distributing cooperation profits among operators of urban rail transit under PPP pattern

  • Published:
Cluster Computing Aims and scope Submit manuscript

Abstract

The financing channels, investors and operators of urban rail transit are becoming more and more diversified, and public private partnership pattern has been increasingly suggested in financing and investment field of urban rail transit in China. The diversification of investors of urban rail transit will no doubt lead to the diversification of operators of urban rail transit network. To legitimately distribute the cooperation profits among operators, a model is developed based on passenger’s path choice behavior by considering travel period, travel time, transfer convenience and the comprehensive proportion of different service types provided by operators. In accordance with the features of urban rail transit network and origin-destination (OD) pairs of transferring among lines of different operators, a scheme of improved rail transit network is proposed. On the basis of the algorithm of breadth-first search and depth-first search, an algorithm of searching effective paths based on backtracking and traversing along the shortest path is established by considering the factor of transfer. Taking the example of Shenzhen’s rail transit network, three typical OD pairs are selected to measure and calculate, compare and analyze by six different conditions. The result shows that travel period, travel time, transfer convenience, and service types provided by operators exert great influence on the distribution of cooperation profits. Therefore, it is advisable to comprehensively consider all of these factors to improve the accuracy of cooperation profits distribution. Moreover, the proposed algorithm can search effective paths efficiently.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3

Similar content being viewed by others

References

  1. Carbonara, N., Costantino, N., Pellegrino, R.: Concession period for PPPs: a win-win model for a fair risk sharing. Int. J. Proj. Manag. 32(7), 1223–1232 (2014)

    Article  Google Scholar 

  2. Tang, L., Shen, Q.: Factors affecting effectiveness and efficiency of analyzing stakeholders’ needs at the briefing stage of public private partnership projects. Int. J. Proj. Manag. 31(4), 513–521 (2013)

    Article  Google Scholar 

  3. Qi, X., Yi, C., Li, J.: The study on the barrier of implementation of PPP project’s assessment system based on VFM in China. Appl. Mech. Mater. 409–410, 1543–1546 (2013)

    Article  Google Scholar 

  4. Javed, A.A., Lam, P.T.I., Chan, A.P.C.: Change negotiation in public-private partnership projects through output specifications: an experimental approach based on game theory. Constr. Manag. Econ. 32(4), 323–348 (2014)

    Article  Google Scholar 

  5. Engel, E., Fischer, R.D., Galetovic, A.: Renegotiation in public-private partnerships: theory and evidence. Int. Transp. Forum Discuss. Pap. 17, 1–24 (2014)

    Google Scholar 

  6. Francesconi, M., Muthoo, A.: Control rights in public-private partnerships. IZA Discuss. Pap. 2143, 1–37 (2006)

    Google Scholar 

  7. Chan, A.P.C., Yeung, J.F.Y., Yu, C.C.P., Wang, S.Q., Ke, Y.J.: Empirical study of risk assessment and allocation of public-private partnership projects in China. J. Manag. Eng. 27(3), 136–148 (2011)

    Article  Google Scholar 

  8. Ebrahimnejad, S., Mousavi, S.M., Seyrafianpour, H.: Risk identification and assessment for build-operate-transfer projects: a fuzzy multi attribute decision making model. Exp. Syst. Appl. 37(1), 575–586 (2010)

    Article  Google Scholar 

  9. Hwang, B.G., Zhao, X.B., Gay, M.J.S.: Public private partnership projects in Singapore: factors, critical risks and preferred risk allocation from the perspective of contractors. Int. J. Proj. Manag. 31(3), 424–433 (2013)

    Article  Google Scholar 

  10. Macario, R.: Future challenges for transport infrastructure pricing in PPP arrangements. Res. Transp. Econ. 30(1), 145–154 (2010)

    Article  Google Scholar 

  11. Smyth, H., Edkins, A.: Relationship management in the management of PFI/PPP projects in the UK. Int. J. Proj. Manag. 25(3), 232–240 (2007)

    Article  Google Scholar 

  12. Carmona, M.: The regulatory function in public-private partnerships for the provision of transport infrastructure. Res. Transp. Econ. 30(1), 110–125 (2010)

    Article  Google Scholar 

  13. Scharle, P.: Public-private partnership (PPP) as a social game. Innov. Eur. J. Soc. Sci. Res. 15(3), 227–252 (2002)

    Article  Google Scholar 

  14. Lossa, E., Martimort, D.: Risk allocation and the costs and benefits of public-private partnerships. RAND J. Econ. 43(3), 442–474 (2012)

    Article  Google Scholar 

  15. Shi, F., Zhou, Z., Yao, J., Huang, H.L.: Incorporating transfer reliability into equilibrium analysis of railway passenger flow. Eur. J. Oper. Res. 220(2012), 378–385 (2012)

    Article  MATH  MathSciNet  Google Scholar 

  16. Hung, R., Jiang, Y.K., Liu, Z.L., Yang, Y.Z., Jiang, W.: Algorithm and implementation of urban rail transit network based on joint operation. J. Transp. Syst. Eng. Inf. Technol. 10(2), 130–135 (2010)

    Google Scholar 

  17. Si, B.F., Zhong, M., Liu, J.F., Gao, Z.Y., Wu, J.J.: Development of a transfer-cost-based Logit assignment model for the Beijing rail transit network using automated fare collection data. J. Adv. Transp. 47(3), 297–318 (2013)

    Article  Google Scholar 

  18. Kusakabe, T., Iryo, T., Asakura, Y.: Estimation method for railway passengers’ train choice behavior with smart card transaction data. Transportation 37(5), 731–749 (2010)

    Article  Google Scholar 

  19. Guo, Z., Wilson, N.H.M.: Assessment of the transfer penalty for transit trips: a geographic information system-based disaggregate modeling approach. Transp. Res. Rec. 1872(2004), 10–18 (2004)

  20. Guo, Z., Wilson, N.H.M.: Modeling effects of transit system transfers on travel behavior: case of commuter rail and subway in Downtown Boston, Massachusetts. Transp. Res. Rec. 2006(2007), 11–20 (2007)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Li Jia or Yinggui Zhang.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Jia, L., Lei, D., Zhang, Y. et al. The model and algorithm of distributing cooperation profits among operators of urban rail transit under PPP pattern. Cluster Comput 20, 3023–3036 (2017). https://doi.org/10.1007/s10586-017-0973-6

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10586-017-0973-6

Keywords

Navigation