Abstract
This work aims at applying the concepts of value stream mapping (VSM) in an auto-parts company in the ABC region of Sao Paulo. By mapping the current state of art, it was possible to identify the waste present in an assembly line of clutch discs. The future state was suggested with improvements for elimination of waste and reduction of lead time, which went from 60.5 to 4.14 days. Simulations were made using current and future states to support the suggested improvements, and reduction of 7 % in total production time was verified, as well as 10 % increase in the use of work positions. The results showed that VSM combined with simulation is a good alternative in the decision-making for change in production process.
Similar content being viewed by others
References
Liker JK (2005) O Modelo Toyota: 14 principios de gestão do maior fabricante do mundo. Bookman, Porto Alegre
Rother M, Shook J (2003) Aprendendo a Enxergar: mapeando o fluxo de valor para agregar valor e eliminar o desperdício. Lean Institute Brasil, São Paulo
Lustosa L, Mesquita MA, Quelhas O, Oliveira R (2008) Planejamento e controle da Produção. Elsevier, Rio de Janeiro
Nash MA, Poling SR (2008) Mapping the total value stream. CRC Press, New York
Abdulmalek FA, Rajgopal J (2007) Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study. Int J Prod Econ 107:223–236
Anand G, Kodali R (2009) Simulation model for the design of lean manufacturing systems—a case study. Int J Product and Qual Manag 4(5–6):691–714
Womack Jp, Jones DT (2003) A Mentalidade Enxuta nas empresas: elimine o desperdício e crie riqueza 9th ed. Campus, Rio de Janeiro
Shank JK, Govindarajan V (1993) Strategic cost management: the new tool for competitive advantage. The Free Press, New York
Belokar Rm, Kumar V; Kharb SS (2012) An application of value stream mapping in automotive industry: a case study. International Journal of Innovative Technology and Exploring Engineering (IJITEE) Vol 1 No 2.
Rajakumar S, Arunachalan VP, Selladurai V (2005) Simulation of workflow balancing in assembly shopfloor operations. J Manuf Technol Manag 16(3):265–281
Mönch L (2007) Simulation-based benchmarking of production control schemes for complex manufacturing systems. Control Eng Pract 15(11):1381–1393
Freitas Filho PJ (2008) Introdução à modelagem e simulação de sistemas com aplicações em arena 2. Visual Books, Florianópolis
Donatelli A, Harris G (2004) Combining value stream mapping and discrete event simulation, in Proceedings of the Huntsville Simulation Conference. Society for Modeling and Simulation International, San Diego, CA
McDonald T, VAN Aken EM, Rentes AF (2002) Utilizing simulation to enhance value stream mapping: a manufacturing case application. Int J Logist: Res and Appl 5(2):213–232
Mohamed AS, Khaled SE, Aziz EE (2011) Value stream map simulator using ExtendSim. Proceedings of the World Congress on Engineering, London
Rajenthirakumar D et al. (2012) Lean manufacturing: a study of application in a customary atmosphere. International Journal of Lean Thinking. pp. 20–35.
Lian YH, Landeghem HV (2002) An application of simulation and value stream mapping in lean manufacturing. In: Proceedings 14th European Simulation Symposium, pp 1–8.
Ohno T (1988) Just-in-time for today and tomorrow. Productivity Press.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Andrade, P.F., Pereira, V.G. & Del Conte, E.G. Value stream mapping and lean simulation: a case study in automotive company. Int J Adv Manuf Technol 85, 547–555 (2016). https://doi.org/10.1007/s00170-015-7972-7
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-015-7972-7