Skip to main content
Log in

Interaction between central planners and firms: The uncertainty of target adjustment

  • Published:
Economics of Planning Aims and scope Submit manuscript

Conclusions

The interaction between planners and firms in a centrally planned economy has already been treated by a number of authors. They have generally focused upon the firm's performance in the face of various reward structures and have, with the exception of Gindin (1970) and Snowberger (1977), not dealt explicitly with the feed-back effect this performance has on the planners' adjustment of the reward structure for the future. This paper has extended the previous analysis of the feedback mechanism into the case where a firm knows that the planners have the power to make such adjustments but does not know precisely what form they will take. We have developed models which reflect several different ways in which a firm might respond to this uncertainty. Furthermore, we have introduced an adjustment scheme which considers the performance of all firms in the industry when setting a target for any one of them, in addition to treating the ordinary assumption that a firm's future target depends only upon its own present underor overfulfillment.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • BoninJ. P., “On Soviet Managerial Incentive Structures”,Southern Economic Journal, 42 (January, 1976a), 490–495.

    Google Scholar 

  • BoninJ. P., “On the Design of Managerial Incentive Structures in a Decentralized Planning Environment”,American Economic Review, 66 (September, 1976b), 682–687.

    Google Scholar 

  • DomarE. D., “On the Optimal Compensation of a Socialist Manager”,Quarterly Journal of Economics, 88 (February, 1974), 1–18.

    Google Scholar 

  • EllmanM., “Bonus Formulae and Soviet Managerial Performance: A Further Comment”,Southern Economic Journal, 39 (April, 1973), 652–653.

    Google Scholar 

  • FanL. S., “On the Reward System”,American Economic Review, 65 (March, 1975), 226–229.

    Google Scholar 

  • GindinS., “A Model of the Soviet Firm”,Economics of Planning, 10 (1970), 145–157.

    Google Scholar 

  • KerenM., “On the Tautness of Plans”,Review of Economic Studies, 39 (October, 1972), 469–486.

    Google Scholar 

  • LeemanW. A., “Basic Formulae and Soviet Managerial Performance”,Southern Economic Journal, 36 (April, 1970), 434–445.

    Google Scholar 

  • LoebM. and MagatW. A., “Success Indicators in the Soviet Union: The Problem of Incentives and Efficient Allocations”,American Economic Review, 68 (March, 1978), 173–181.

    Google Scholar 

  • RushingF. W., “Basic Formulae and Soviet Managerial Performance: Comment”,Southern Economic Journal, 38 (April, 1972), 569–572.

    Google Scholar 

  • SnowbergerV., “The New Soviet Incentive Model: Comment”,Bell Journal of Economics, 8 (Autumn, 1977), 591–600.

    Google Scholar 

  • WeitzmanM. L., “The New Soviet Incentive Model”,Bell Journal of Economics, 7 (Spring, 1976), 251–257.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

8060 Niwot Road, # 19, Longmont, Colorado 80501, USA.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Snowberger, V. Interaction between central planners and firms: The uncertainty of target adjustment. Econ Plann 15, 168–183 (1979). https://doi.org/10.1007/BF00583670

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF00583670

Keywords

Navigation