Abstract
In the industrial world, since the amount of energy to consume is very large, it is required to manage and reduce energy consumption while maintaining a high productivity. In order to approach the theoretical realization the production conditions that affect a productivity or energy consumption, we investigate the formulation of the relationship between energy consumption and production throughput, and verify it by using numerical simulation.
Keywords
You have full access to this open access chapter, Download conference paper PDF
1 Introduction
Recently, in various fields, reduction of energy consumption has been an important issue. [1–3] In particular, in the world of industrial, since the amount of energy to consume is very large, management of energy consumed is greatly required. It is necessary to reduce energy consumption while maintaining a high productivity. [3]
In the previous study, a simulation environment for sustainable manufacturing systems considering the productivity and energy consumption have been established, and an implementation for the simulation environment has been proposed [5, 6]. The state transition model for facility has been proposed and expressed by using a Unified Modelling Language (UML) model. A case study for a middle-scale semiconductor manufacturing line was carried out by using constructed simulation system. It has been found that the energy consumption per production throughput increase with decreasing lot size and, become a constant value with increasing lot size. This result has indicated that the number of times of setting-up increase with decreasing lot size. Since the energy is required for setting-up, energy consumption per production throughput becomes large.
However, in the manufacturing system, the theoretical realization the production conditions, such as lot size, failure rate, and so on that affect a productivity and energy consumption is not understood clearly. In this paper, therefore, we propose the formulation of the relationship between energy consumption and production throughput, and verify it by using numerical simulation system constructed in our previous report.
2 Formalizing the Energy Consumption and Throughput
2.1 Energy Consumption Per Throughput, \( \varvec{U} \)
One of the most important indicators in the evaluation of productivity and energy consumption of manufacturing systems is energy consumption per production throughput (\( U \)). \( U \) is defined as
Here, \( U \) is energy consumption per production throughput and the unit is [J/product], \( E \) is energy consumption and and the unit is [J], \( P \) is production throughput and the unit is [product]. An electric energy consumption per second is also defined electric power consumption \( e \) [W].
A line with n equipment which have m kinds of facility state is assumed in this study. An facility in line always belongs to some status during operating time (\( T \)), so the operating time of k-th facility (\( T^{k} \)) equal to \( T \). The relation between \( T \) and the total of operating time of \( x \) state in k-th facility (\( T_{x}^{k} \)) is given by
The total electric energy consumption is given by
where \( E^{k} \) is the total electric energy consumption of k-th facility, and \( e_{x}^{k} \) is electric power consumption of x state in k-th facility. Therefore, the energy consumption per production throughput can be written as
Here \( U^{k} \) is the energy consumption per production throughput in k-th facility. By using Eq. (4), \( U \) can be calculated by \( e_{x}^{k} \), \( T_{x}^{k} \) and \( P \). Figure 1 shows the summary of the relationship between \( E, P, T, U, e, \,{\text{and}} \,p \).
2.2 Coefficient of Work in Process, \( \varvec{q}^{\varvec{k}} \)
In a line, a buffer is generally set up between facility. When some work exist in a buffer, production throughput in line and production throughput of each facility (\( P^{k} \)) is not same, that is,
Here, coefficient of work in process (\( q^{k} \)) can be defined as
In the case of \( P^{k} = P \), \( q^{k} \) equal 1. Usually, \( q^{k} \) increases as previous process, i.e.,
2.3 Operating Time of State of \( \varvec{x} \) in K-th Facility, \( \varvec{T}_{\varvec{x}}^{\varvec{k}} \)
In this study, a state of running, setting-up, and idling will be discussed. The state of running, setting-up, and idling are described by x = r, s, and i, respectively.
In a running state in k-th facility, the production throughput per second (\( p_{r}^{k} \)) is the reciprocal of the cycle time (\( c_{r}^{k} \)). Production throughput in k-th facility (\( P_{r}^{k} \)) is calculated by multiplying \( T_{r}^{k} \) by \( {\text{c}}_{\text{r}}^{\text{k}} = 1/p_{r}^{k} \). When the \( q_{r}^{k} \) is taken into account, \( T_{r}^{k} \) is obtained as
P divided by lot size (LS) is frequency of setting-up in k-th facility. The \( q_{r}^{k} \) and \( \lambda^{\text{k}} \) which is defended by the time required for a once setting-up are take into consideration, \( T_{s}^{k} \) obtained as
It seems to be reasonable that \( T_{s}^{k} \) decrease with increasing LS.
Since a facility in line always belongs to some status during operation, so the operating time of k-th facility (\( T^{k} \)) equal to the sum of \( T_{r}^{k} \), \( T_{s}^{k} \) and the operating time of idling state in k-th facility (\( T_{i}^{k} \));
As \( T^{k} = T \),
Equations (9) (10) and (11) are substituted into Eq. (4), \( U^{\text{k}} \) is calculated as
3 Simulation
The simulation system of manufacturing has already been developed using the Witness software which is a commercial discrete event simulator (Lanner). In this paper, a middle-scale semiconductor manufacturing line which consist of three facilities, the solder printing facility, the IC mounting facility (mounter facility), and the solder reflow facility is simulated. The three facilities were modelled in Witness using our proposed state transition model. The printing facility, the mounter facility, and the reflow facility are numbered to k = 1 to 3, respectively. Figure 2 show a simulation model of the middle-scale semiconductor manufacturing line. Table 1 shows the simulation input data. In contrast to simulation, input electric power consumption of running state and idle state in reflow facility (\( e_{r}^{k} \,{\text{and}} \,e_{r}^{k} \)) different between rising and falling of temperature in furnace, the average value is used in formulation as below. There are four types of lot sizes as 15, 30, 90, 360. The size of buffer between each facilities is big enough. The simulation period in this simulation is 40 h (5 day \( \times \) 8 h).
4 Results and Discussion
Figure 3 show the relationship between electric energy consumption per production throughput and inverse of lot size. The opened circle in Fig. 3 indicate the simulation results of the electric energy consumption per production throughput of printing facility \( (U^{1} ) \). Note that the linear correlation exists between the \( U^{1} \) and inverse of lot size. In this simulation, since the cycle time of facilities is almost same, and the failure of facilities is not considered, the \( q^{k} \) can be considered as 1. Furthermore, the operating time of idling state in the printing facility is zero, because the size of buffer between each facilities is big enough. Taking these assumption into account, \( U^{1} \) and \( p \) are given by
respectively. The dashed line in Fig. 3 denotes calculated Eq. (13). The simulation results and formulation results are in reasonably good agreement. The opened circle and dashed line in Fig. 4 indicate the simulation results of production throughput and formulation results (Eq. (14)), respectively. Note that the results agrees well. We can obtain a relation between \( U^{1} \) and \( p \) as
from Eqs. (13) and (14). We can understand that energy consumption per production throughput decreases with an increase productivity.
5 Conclusion
In order to approach the theoretical realization the production conditions that affect a productivity or energy consumption, we investigated the formulation of the relationship between energy consumption and production throughput, and verified it by using numerical simulation. The simulation results and formulation results are in reasonably good agreement. The relation between lot size and energy consumption per production throughput, production throughput were understood. It is clearly shown that energy consumption per production throughput decreases with an increase productivity.
References
Göschel, A., Schieck, F., Schönherr, J.: Method for energy and resource balancing demonstrated as an example of the hot sheet metal production process. CIRP Ann.-Manuf. Technol. 61(1), 399–402 (2012)
Fujitsu, Co., Green Monodukuri: RAGON. http://jp.fujitsu.com/about/csr/eco/services/energysaving/emdragon/ (Accessed 18-5-2012)
Nissan Motor Co., A case study of energy consumption per unit of production throughput. http://www.jsme.or.jp/publish/ronbun/JSME_Manual_20100730.pdf (Accessed 10-5-2011)
The Energy Conservation Center Japan, The revised energy conservation law. http://www.eccj.or.jp/law/pamph/outline_revision/new_outline2010.pdf (Accessed 25-4-2011)
Hibino, H., Sakuma, T., Yamaguchi, M.: Manufacturing system simulation for evaluation of productivity and energy consumption. J. Adv. Mech. Des. Syst. Manuf. 8(2), 1–13 (2014)
Hibino, H., Sakuma, T., Yamaguchi, M.: Simulation for sustainable manufacturing system considering productivity and energy consumption. In: Grabot, B., Vallespir, B., Gomes, S., Bouras, A., Kiritsis, D. (eds.) Advances in Production Management Systems, Part II. IFIP AICT, vol. 439, pp. 310–318. Springer, Heidelberg (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 IFIP International Federation for Information Processing
About this paper
Cite this paper
Kobayashi, T., Yamaguchi, M., Hibino, H. (2015). Formulation of Relationship Between Productivity and Energy Consumption in Manufacturing System. In: Umeda, S., Nakano, M., Mizuyama, H., Hibino, N., Kiritsis, D., von Cieminski, G. (eds) Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth. APMS 2015. IFIP Advances in Information and Communication Technology, vol 459. Springer, Cham. https://doi.org/10.1007/978-3-319-22756-6_89
Download citation
DOI: https://doi.org/10.1007/978-3-319-22756-6_89